Subject: Civil Engineering Chapter: Advanced Surveying Topic: 21.5 Global Positioning System
The Global Positioning System, commonly called GPS, is a satellite-based radio navigation system that provides the position, velocity and time to a user anywhere on or near the surface of the earth. The system was developed and is operated by the United States Department of Defense, and it consists of three segments: the space segment, comprising a constellation of satellites; the control segment, comprising ground stations that monitor and manage the satellites; and the user segment, comprising the receivers used by surveyors, navigators and the general public. The position of a point is determined by measuring the distance of the receiver from a number of satellites whose positions are precisely known, and by solving for the unknown coordinates and the receiver clock error.
The principle of GPS is based on the measurement of the time taken by a radio signal to travel from a satellite to the receiver. Each satellite transmits a coded signal containing its own position and the precise time of transmission, and the receiver compares this with its own clock to determine the travel time, from which the distance to the satellite is computed as the product of the speed of light and the travel time. Because the receiver clock is not perfectly synchronised with the satellite clocks, the measured distance, called a pseudo-range, contains an error, and a minimum of four satellites is required to solve for the three coordinates, latitude, longitude and height, together with the receiver clock error.
GPS has become the backbone of modern positioning in surveying and many other fields. It is used for geodetic control surveys, for navigation on land, sea and air, for the monitoring of structural deformation, for the establishment of precise time, and for the positioning of points in areas where conventional survey is difficult. In civil engineering it is used for the control of construction machinery, for the layout of highways and pipelines, and for the mapping of the terrain. In this chapter we will study the structure of the GPS, the principle of position determination, the sources of error, and the survey methods used to achieve the required accuracy.
The space segment of the GPS consists of a constellation of about 24 satellites arranged in six orbital planes, each plane containing four satellites, at an orbital altitude of approximately 20,200 km above the earth. This arrangement ensures that at any point on the earth and at any time, at least four satellites are visible above the horizon, which is the minimum number required for a three-dimensional position fix. Each satellite carries highly accurate atomic clocks and continuously transmits signals on the L1 frequency of 1575.42 MHz and the L2 frequency of 1227.60 MHz. The L1 carrier is modulated with the coarse acquisition code, called the C/A code, which is available to all users, while the L2 carrier carries the precision code, called the P code, which is restricted.
The control segment consists of a master control station and a number of monitoring stations distributed around the world. The monitoring stations track all the satellites continuously, measure their ranges, and send the data to the master control station, which computes the precise orbits, called ephemerides, and the clock corrections for each satellite. This information is transmitted to the satellites and broadcast to the users as part of the navigation message. The control segment thus keeps the satellites on their correct orbits and ensures that the clocks remain synchronised, so that the users can compute their positions with confidence.
The user segment consists of GPS receivers, which may be hand-held navigation units or precise geodetic receivers. Each receiver tracks the signals of several satellites, measures the pseudo-ranges and the carrier phase, and computes the position, velocity and time. The accuracy of the position depends on the type of receiver and the measurement technique: a hand-held navigation receiver gives an accuracy of a few metres, while a precise geodetic receiver used in differential mode gives accuracy in the range of millimetres to centimetres. For engineering survey work, the differential techniques are essential because they eliminate the common errors.
The receiver determines its position by the process of trilateration. Each measured distance to a satellite places the receiver on a sphere of that radius centred on the satellite, and the intersection of several such spheres gives the position. Because the receiver clock has an unknown error, four satellites are required: three equations solve the three coordinates assuming no clock error, and the fourth equation solves the clock error. The distance measured is called a pseudo-range because it contains the receiver clock error, and the position is computed by an iterative least-squares solution.
The accuracy of GPS is limited by several sources of error. Satellite clock errors and ephemeris errors are errors in the satellite time and position broadcast in the navigation message. Ionospheric and tropospheric delay are caused by the slowing of the radio signal as it passes through the charged layers of the atmosphere and through the moist lower atmosphere. Multipath is the error caused by the signal arriving at the antenna after reflection from buildings, the ground or water surfaces, so that the measured distance is too long. Receiver noise and the geometrical arrangement of the satellites, described by the dilution of precision, also affect the accuracy. When only the C/A code is used, the typical position accuracy is about 5 to 10 metres.
To improve the accuracy, the technique of differential GPS, or DGPS, is used. In differential positioning, a base receiver is set up at a point of precisely known coordinates, and a rover receiver measures the points to be surveyed. Because the two receivers observe the same satellites at the same time, the errors at the base station can be estimated by comparing the known and measured positions, and corrections can be applied to the rover measurements, eliminating the errors common to both receivers. When the carrier phase of the signals is measured instead of the code, and the measurements are processed after the survey, the relative accuracy can reach a few millimetres over distances of several kilometres, a technique called static differential GPS.
Example 1: A GPS signal travels from a satellite to a receiver in 0.07 seconds. Compute the distance of the satellite, taking the speed of light as 3 x 10 to the power 8 m/s.
Solution: Distance = velocity x time = 3 x 10 to the power 8 x 0.07 = 21 x 10 to the power 6 m = 21,000 km. Hence the satellite is about 21,000 km from the receiver.
Example 2: A receiver simultaneously observes four satellites. Why are four satellites necessary, and what does the fourth equation solve?
Solution: Three satellites are needed to solve the three unknown coordinates of the receiver. The fourth satellite is necessary to solve the unknown error of the receiver clock, because the pseudo-ranges are all affected by this common error. Hence four satellites give a three-dimensional fix together with the clock correction.
Example 3: In a differential GPS survey the base receiver at a known station measures a position that differs from the true position by 4 m in northing and 3 m in easting. If the rover position computed independently is 3 m north and 2 m east of the base, what correction must be applied?
Solution: The correction to the northing = true - measured = 0 - 4 = -4 m, and the correction to the easting = 0 - 3 = -3 m. Applying these corrections to the rover, corrected northing = 3 + (-4) = -1 m and corrected easting = 2 + (-3) = -1 m. Hence the rover lies 1 m south and 1 m west of the base station.
| Segment | Components | Function |
|---|---|---|
| Space segment | 24 satellites in 6 planes at about 20,200 km | Transmit signals with position and time |
| Control segment | Master control and monitoring stations | Track satellites, compute orbits and clock corrections |
| User segment | GPS receivers | Measure pseudo-ranges and compute position |
| Error source | Cause | Remedy |
|---|---|---|
| Satellite clock and ephemeris | Errors in broadcast time and orbit | Differential GPS, precise ephemeris |
| Ionospheric delay | Charged particles slow the signal | Dual frequency, DGPS |
| Tropospheric delay | Moisture in lower atmosphere | Modelling, DGPS |
| Multipath | Reflected signal paths | Good antenna location, choke rings |
| Dilution of precision | Poor satellite geometry | Choose observation time, more satellites |
| Positioning mode | Accuracy | |
| --- | --- | |
| Hand-held navigation | About 5 to 10 m | |
| Differential GPS (DGPS) | About 1 m | |
| Static carrier phase | Millimetre to centimetre level |
flowchart TD
A[Global Positioning System] --> B[Space segment]
A --> C[Control segment]
A --> D[User segment]
A --> E[Position determination]
A --> F[Errors and accuracy]
B --> B1[24 satellites in 6 planes]
B --> B2[L1 and L2 frequencies]
C --> C1[Monitoring stations]
C --> C2[Master control station]
D --> D1[Navigation receivers]
D --> D2[Geodetic receivers]
E --> E1[Trilateration]
E --> E2[Pseudo-range measurement]
E --> E3[Four satellites needed]
F --> F1[Clock and ephemeris errors]
F --> F2[Atmospheric delays]
F --> F3[Multipath]
F --> F4[Differential GPS]
The following diagrams show the satellite constellation and the principle of trilateration.
The Global Positioning System is a satellite-based system that provides precise position, velocity and time to users anywhere on the earth. In this chapter we have studied the three segments of the system, the space segment with its constellation of 24 satellites, the control segment that maintains the orbits and clocks, and the user segment comprising the receivers. We have understood the principle of trilateration and the measurement of pseudo-ranges, learnt why four satellites are necessary, and examined the sources of error, including clock and ephemeris errors, atmospheric delays, multipath and dilution of precision. We have also studied the differential GPS technique, which removes the common errors and achieves centimetre-level accuracy when the carrier phase is used. The numerical examples illustrate the computation of satellite distance and the application of differential corrections. GPS has become indispensable in surveying and civil engineering, and a thorough understanding of its segments, signals, errors and techniques is essential for the advanced surveying portion of competitive examinations.