8.6 Batching Mixing and Transportation

Start MCQ Practice →

8.6 Batching Mixing and Transportation

Subject: Civil Engineering Chapter: Concrete Technology Topic: 8.6 Batching Mixing and Transportation

1. Introduction

The production of good concrete on the site depends as much on the operations of batching, mixing and transportation as on the quality of the ingredients and the mix design. Batching is the process of measuring the quantities of cement, aggregates and water for each batch of concrete, mixing is the process of combining these materials into a uniform mass, and transportation is the process of carrying the mixed concrete from the mixer to the place of deposition. A concrete mix that is designed perfectly in the laboratory will still be a failure if the batching is careless, the mixing is incomplete or the concrete is allowed to segregate during transport.

The correct measurement of the ingredients, called batching, is essential because the properties of the concrete, particularly the strength and the water-cement ratio, depend directly on the proportions in which the materials are combined. Batching may be done by volume or by weight, and weight batching is always preferred because it is more accurate and is not affected by the bulking of sand and the moisture content of the aggregates. The accuracy of the batching is controlled by the tolerances of IS 456, which permit a variation of plus or minus 3 percent for cement and water and plus or minus 5 percent for the aggregates.

In this chapter we will study the methods of batching by volume and by weight, the types of mixers used for producing concrete, the correct procedure of mixing and the mixing time, the methods of transporting concrete including transit mixers, pumps and tremie, and the precautions to be taken to avoid segregation and bleeding during transport. The standard times, tolerances and the names of the equipment are the most frequently tested items in this topic.

2. Batching of Concrete

The batching of cement is always done by weight, because the cement is packed in bags of 50 kg and the accuracy of the cement content is critical for the strength. The aggregates may be batched by volume or by weight. Volume batching is simple and cheap and is used for small works and nominal mixes, and the measurement is usually done with a gauge box or a farma, which is a box of known volume, normally of the same size as the volume of cement in the mix. The sand is measured by volume with the gauge box, but allowance must be made for the bulking of sand, because the moist sand occupies a larger volume than the same weight of dry sand.

The error in volume batching arises mainly from the bulking of the sand, the variations in the moisture content and the difficulty of filling the gauge box uniformly, and these errors are large enough to make volume batching unsatisfactory for important works. Weight batching is therefore specified for all important works, and it is done with a weighing machine or an automatic batching plant in which each material is weighed separately. The accuracy requirements of IS 456 state that the cement and water must be measured within plus or minus 3 percent and the aggregates within plus or minus 5 percent of the required quantities.

The batching of water is also critical because the water-cement ratio controls the strength. The water is measured by volume with a calibrated water tank, a measuring device attached to the mixer, or by weighing, and the free surface moisture of the aggregates must be deducted from the water added while the water absorbed by the aggregates must be added. The mixing water includes the free water present on the surface of the aggregates, so the batching of water and the batching of the aggregates must be considered together.

3. Mixing of Concrete

Mixing is the process of combining the cement, aggregates and water into a homogeneous mass, and it is done either by hand or by machine. Hand mixing is used only for very small quantities of work, and it is done on a watertight platform where the dry materials are first spread and mixed, a depression is formed in the centre, and the water is poured in and the whole mass is turned over until it is uniform. Hand mixing requires about 10 percent more cement than machine mixing to compensate for the poorer uniformity, and it should be avoided for all important works.

Machine mixing is carried out in a concrete mixer, which is a rotating drum fitted with blades. The two main types are the tilting type mixer and the non-tilting type mixer, and the mixer may be operated by batch or continuously. In the typical batch mixer of 200 litres capacity, the mixing is done by loading the aggregates and the cement into the drum, adding the water, and rotating the drum for the required mixing time. The mixing time, which is the time from the completion of loading to the beginning of discharge, is normally 1.5 to 2 minutes, and it increases the uniformity of the mix up to a limit, beyond which further mixing is wasteful and may cause segregation.

The order of loading the materials into the mixer is important. The coarse aggregate is loaded first, followed by the fine aggregate, and then the cement, and a part of the water is added while the materials are being loaded so that they are wetted gradually. The rotating drum of a batch mixer should not be overfilled, and the mixing should continue until the concrete is uniform in colour and consistency. A pan mixer, in which the mixing is done by rotating blades in a fixed pan, is used for stiff and high-strength concrete, where a more intensive mixing action is needed.

4. Transportation of Concrete

The transportation of concrete from the mixer to the place of deposition must be done quickly, so that the concrete is placed before the initial setting begins, and without segregation or loss of the ingredients. The time between the mixing and the final placing is limited by the codes to 30 minutes for a batch, and the concrete must be kept in constant agitation where long transport is involved. The common methods of transportation are the wheelbarrow and the crane for short distances, the hoist and the chute for vertical movement, the belt conveyor and the skip for special situations, and the transit mixer and the concrete pump for large and distant works.

The transit mixer, also called a truck mixer or agitating truck, carries the concrete in a rotating drum over long distances, and it may mix the concrete during the journey in which case it is called a truck mixer, or simply agitate a ready-mixed concrete in which case it is called an agitator. Ready-mixed concrete is produced at a central batching plant and transported to the site in the transit mixer, which saves space on the site and ensures better quality control. The concrete pump delivers the concrete through a pipeline to heights and distances that cannot be reached by other means, and the concrete used for pumping must be highly workable with a slump of 100 to 150 mm.

The tremie method is used for placing concrete under water, such as in pile caps and underwater foundations, in which the concrete is poured through a vertical pipe with a hopper at the top, and the pipe is kept embedded in the concrete so that the water does not wash away the cement. Concrete should not be allowed to fall freely from a height greater than about 1 metre, because a free fall causes segregation, and the chutes used for transport should be steep enough to let the concrete flow but not so steep that it gains excessive velocity and segregates.

5. Quick Revision Tables

Table 1: Batching Tolerances and Mixing Time

Operation Requirement
Cement batching accuracy Plus or minus 3 percent by weight
Water batching accuracy Plus or minus 3 percent by volume
Aggregate batching accuracy Plus or minus 5 percent by weight
Mixing time of batch mixer 1.5 to 2 minutes
Extra cement for hand mixing About 10 percent more
Maximum time before placing 30 minutes

Table 2: Methods of Transportation and Their Use

Method Distance / use Special requirement
Wheelbarrow, crane Short distance Avoid segregation
Chute Vertical and sloped drop Steepness between 1:2.5 and 1:3
Belt conveyor Long horizontal run Avoid spillage
Transit mixer Long distance, ready-mixed Drum rotated during travel
Concrete pump Heights and long runs Slump 100-150 mm
Tremie Underwater concreting Pipe embedded in concrete

6. Mind Map

flowchart TD
    A[Batching, Mixing and Transportation] --> B[Batching]
    A --> C[Mixing]
    A --> D[Transportation]
    B --> B1[Volume batching]
    B --> B2[Weight batching]
    B --> B3[Bulking of sand]
    B --> B4[Accuracy plus minus 3 and 5 percent]
    C --> C1[Hand mixing]
    C --> C2[Machine mixing]
    C --> C3[Batch mixer]
    C --> C4[Pan mixer]
    C --> C5[Mixing time 1.5 to 2 minutes]
    D --> D1[Wheelbarrow and crane]
    D --> D2[Transit mixer]
    D --> D3[Concrete pump]
    D --> D4[Tremie for underwater]
    D --> D5[Placing within 30 minutes]
    A --> E[Segregation and bleeding control]

7. Important Diagrams (SVG)

The following diagrams show the batch mixer and the arrangements for pumping and tremie placement of concrete.

Concrete Batch Mixer Rotating drum Loading hopper aggregates + cement Mixing time of batch mixer: 1.5 to 2 minutes Water is added during loading, drum rotates continuously Standard mixer capacity: 200 litres output Golden Rule A concrete mixer must be cleaned and the mixing time held between 1.5 and 2 minutes.

Tremie Method for Underwater Concreting Water level HOPPER with concrete Tremie pipe CONCRETE placed underwater Pipe embedded 1 to 3 m in concrete The pipe is kept full and lifted gradually, never withdrawn Water cannot wash away the cement paste Golden Rule In tremie concreting the pipe end stays embedded so water cannot wash the paste.

8. Common Mistakes

  1. Many students use volume batching for important works, although weight batching is required for all important construction because volume batching is inaccurate.
  2. A frequent error is to ignore the bulking of sand in volume batching, which causes the mix to be short of sand and therefore weak.
  3. Some candidates forget the batching tolerances and think the aggregates can vary by up to 10 percent, while IS 456 permits only 5 percent for aggregates and 3 percent for cement and water.
  4. Students often believe that longer mixing always gives better concrete; beyond the optimum time of 1.5 to 2 minutes, the concrete may segregate and heat up.
  5. A common mistake is to allow concrete to fall freely from a height of more than about 1 metre, which causes segregation.
  6. Many candidates forget that hand-mixed concrete requires about 10 percent more cement than machine-mixed concrete to give the same strength.
  7. Some students allow the concrete to remain in the mixer or in transit for longer than 30 minutes, which is the maximum time permitted before placing.
  8. Another recurring error is to withdraw the tremie pipe from the concrete while concreting underwater, which allows water to enter the pipe and wash away the cement.

9. Exam Tips

  1. Remember the batching tolerances of IS 456: plus or minus 3 percent for cement and water, and plus or minus 5 percent for aggregates.
  2. Note that weight batching is preferred over volume batching, and that bulking of sand is the main defect of volume batching.
  3. Memorise the mixing time of 1.5 to 2 minutes for a batch mixer and the standard mixer capacity of 200 litres.
  4. Remember that hand mixing needs about 10 percent more cement than machine mixing.
  5. Know that concrete must be placed within 30 minutes of mixing, and that agitation of the concrete extends the usable time of ready-mixed concrete.
  6. For pumping, remember that the concrete needs a high slump of 100 to 150 mm and the pipeline should not be allowed to run dry.
  7. Use the tremie method for underwater concreting, keeping the pipe embedded in the concrete at all times.
  8. Remember that free fall of concrete from a height greater than about 1 metre causes segregation, so chutes must be used with a slope between about 1:2.5 and 1:3.

10. Conclusion

The operations of batching, mixing and transportation convert the designed proportions of the ingredients into a uniform and workable concrete at the place of deposition, and they must be carried out with care because the best mix design is worthless if the concrete is improperly produced. In this chapter we have studied the methods of batching by volume and by weight, the importance of accuracy and the tolerances of IS 456, the procedures of hand mixing and machine mixing with their correct mixing times, and the various methods of transportation including the wheelbarrow, the chute, the transit mixer, the concrete pump and the tremie. We have also examined the precautions required to prevent segregation, bleeding and the setting of the concrete before placing, including the 30-minute time limit and the limitation of the free fall. The candidate must remember the numerical values of the tolerances, the mixing time, the time limit and the heights, because these small facts are the basis of many examination questions. With the concrete now produced and transported correctly, the next chapter will deal with the compaction and curing which bring the concrete to its full strength.