1. Introduction

An intake structure is the first component of a water supply scheme, and it is the structure that is built to safely withdraw water from the selected source, whether it is a river, a reservoir or a lake, and deliver it to the conveyance system. The intake is always located on the side of the source that faces the treatment plant, and it consists of an intake tower or well connected to the shore by a pipe. For a civil engineering candidate, the study of intake structures is important because questions on the types of intakes, their location, their components and the conditions to be observed while selecting an intake site appear regularly in competitive examinations, and the knowledge is directly used in the design of real water supply projects.

The fundamental requirement of an intake is that it must deliver the required quantity of water of the best possible quality under all conditions of flow in the source. This means that the intake must be able to work during low flow and high flow, it must be protected from silt, debris, ice and floating matter, it must be strong enough to withstand the forces of the current and waves, and it must be so located that the water drawn is as clean as possible. Because the quality of the raw water determines the cost of treatment, the location and design of the intake have a direct effect on the economy of the whole scheme.

In this chapter we will study the types of intake structures, the conditions that govern the selection of an intake site, the detailed components of a river intake and a reservoir intake, and the important design considerations with worked numerical examples on the size of intake pipes. The emphasis throughout is on examination-oriented knowledge, so the names of the components, the standard practices and the numerical procedure are presented in a form that can be memorised easily and applied directly to examination problems.

2. Requirements and Location of an Intake

The selection of the location of an intake is governed by several important conditions. The intake should be located at a place where the water of the source is of the best quality, which generally means away from the entry of sewers, drains and polluted tributaries, and away from the washing ghats and bathing places. The intake should be located in a comparatively deep part of the river so that it does not get exposed during low flow, but it should also be away from the places where the river changes course, so that the intake does not get cut off from the water. The intake must not be located near the outfall of drains and sewers, and the site should be so chosen that the subsequent treatment and pumping costs are the minimum.

The intake must satisfy several requirements during its operation. It must be able to draw the maximum required quantity of water even during the lowest water level in the source, and it should be protected from floating and suspended matter by suitable screens. The intake should not draw water from the bottom of the river, because the bottom water carries the heaviest silt and is of the poorest quality, and it should not draw the top layer either, because the surface water carries floating matter and may contain oil and scum; the best water is usually drawn from a depth of about 2.5 to 3 metres below the water surface. The intake should also be strong enough to withstand the forces of ice, floods, waves and currents, and it should be easily accessible for operation, cleaning and repairs.

The intake is generally located at a place where the bank of the river is stable and permanent, and where the future development of the town does not cause pollution. For a river intake, the water is usually drawn from a point on the concave side of a river bend, because the deepest water flows along the concave bank, while the convex side tends to silt up. However, the intake must still be kept away from the actual erosion zone so that the structure is not undermined. These apparently contradictory requirements are reconciled in practice by locating the intake slightly downstream of the concave bend, where the flow is deep but the bank is stable.

3. Types of Intake Structures

Intake structures are classified according to the source from which they draw water. The main types are the river intake, the reservoir intake, the lake intake, the canal intake and the submerged intake. A river intake is provided where the source is a river or a stream, and it may be a simple intake consisting of a pipe laid under the river bed with its inlet raised on a support, or a more elaborate intake tower. The simple submerged river intake is a pipe whose open end is covered with a wire mesh and placed at the bottom of the river, and it is suitable for small towns where the flow is fairly constant. The intake tower or well is the more elaborate type, and it is built on the river bank or in the river itself.

A reservoir intake is constructed where the source is a storage reservoir behind a dam, and it is usually built as a masonry tower at the upstream face of the dam, with intake openings at different levels so that water can be drawn from the level where it is of the best quality. Because the temperature and quality of water in a reservoir vary with depth, the multiple-level intake permits the selection of the best water. A lake intake is similar to a reservoir intake, and a canal intake is provided where water is drawn from an irrigation canal, in which case the intake is usually a simple pipe with a bell mouth and a strainer. A submerged intake is one in which the intake pipe is laid under the water and is provided with a bell-mouthed inlet protected by a screen; such intakes are cheap but difficult to clean.

An intake tower may be either a wet intake tower or a dry intake tower. In a wet intake tower, the water level inside the tower is the same as the water level in the river, and the water is drawn through openings fitted with penstocks and screens; this is the more common type. In a dry intake tower, the tower is kept dry and the water is drawn through pipes connected to openings in the tower. The intake tower is provided with a pipe that connects it to the shore, through which the water flows to the treatment plant or to a jack well from which it is pumped.

4. Design Considerations and Numerical Example

The design of an intake structure must be based on the maximum rate of withdrawal of water, which is the maximum daily demand of the town together with the allowance for losses. The size of the intake pipe is determined from the discharge that it must carry and the permissible velocity in the pipe. In practice the velocity of flow in the intake pipe is kept between 0.9 and 1.5 metres per second, because a lower velocity allows silt to settle in the pipe while a higher velocity causes excessive friction loss and heavy head loss. The diameter of the pipe is then found from the continuity equation Q = A V, where Q is the discharge in cubic metres per second, A is the cross sectional area of the pipe and V is the velocity.

A worked numerical example will illustrate the calculation. A town has a maximum daily demand of 20 million litres per day, and the losses in the intake and conveyance are estimated at 10 percent, so the intake must carry 20 x 1.10 = 22 MLD. The discharge in cubic metres per second is 22 x 10^6 / (24 x 3600 x 1000) = 0.2546 m3/s. If the permissible velocity is 1.2 m/s, the required area is A = Q / V = 0.2546 / 1.2 = 0.2122 m2, and the required diameter is d = sqrt(4 A / pi) = sqrt(4 x 0.2122 / 3.1416) = sqrt(0.2702) = 0.5198 m. Solution: The intake pipe should have a diameter of about 0.52 metres, or say 550 mm, to carry the maximum daily demand at the permissible velocity.

The intake structure must also be provided with screens to exclude floating matter and fish. A coarse screen or trash rack is provided at the mouth of the intake to stop large floating bodies, and a fine screen is provided at the entrance to the pump well to stop smaller material. The velocity through the openings of the screen is kept low, generally between 0.2 and 0.6 m/s for fine screens, so that the screens do not clog quickly and the fish and other matter are not drawn against the screen with excessive force. The clear area of the screen is worked out from the discharge and the permissible velocity through the screen openings. For example, for a discharge of 0.2546 m3/s and a permissible velocity through the screen of 0.4 m/s, the clear area required is 0.2546 / 0.4 = 0.6365 m2. Solution: The screen must provide a clear opening area of about 0.64 square metres, which with a 40 percent allowance for clogging means a gross screen area of about 0.64 / 0.60 = 1.06 square metres.

5. Quick Revision Tables

Table 1: Types of Intake Structures

Type Source Main Feature Suitability
River intake River or stream Intake tower or well on bank Towns on rivers
Reservoir intake Storage reservoir Multi-level openings at dam face Large cities, dams
Lake intake Lake Tower with variable level openings Lakeside towns
Canal intake Irrigation canal Bell-mouth pipe with strainer Canal-side towns
Submerged intake River Pipe under river bed with screen Small towns, cheap
Wet intake tower River Water level same as river Common type
Dry intake tower River Tower kept dry Where tower dry desirable

Table 2: Design Values for Intakes

Item Recommended Value
Depth of withdrawal below water surface 2.5 to 3 m
Velocity in intake pipe 0.9 to 1.5 m/s
Velocity through fine screens 0.2 to 0.6 m/s
Location on river Concave side of bend, away from erosion
Allowance for losses 10 to 20 percent of demand
Position of intake relative to sewage outfall Upstream of outfall

6. Mind Map

flowchart TD
    A[Intake Structures] --> B[Requirements]
    A --> C[Location Criteria]
    A --> D[Types]
    A --> E[Design Considerations]
    B --> B1[Withdraw max quantity]
    B --> B2[Best quality water]
    B --> B3[Protection from silt and debris]
    B --> B4[Accessible for operation]
    C --> C1[Away from sewers]
    C --> C2[Deep part of river]
    C --> C3[Concave side of bend]
    C --> C4[Stable bank]
    D --> D1[River intake]
    D --> D2[Reservoir intake]
    D --> D3[Lake intake]
    D --> D4[Canal intake]
    D --> D5[Submerged intake]
    D1 --> F[Wet intake tower]
    D1 --> G[Dry intake tower]
    E --> E1[Q = A V]
    E --> E2[Velocity 0.9 to 1.5 m/s]
    E --> E3[Screens]
    E --> E4[Depth 2.5 to 3 m]
    E3 --> H[Coarse screen trash rack]
    E3 --> I[Fine screen at pump well]

7. Important Diagrams (SVG)

The following diagrams help us visualise the layout of a river intake and the components of an intake structure.

River Intake Structure - Section RIVER WATER LEVEL (variable) RIVER BED (sand and silt) Intake well Screen Conduit pipe to shore Jack well and pump To plant High water level Low water level Water drawn 2.5 to 3 m below surface Golden Rule Draw water 2.5 to 3 m below the surface, away from silt at the bottom and floating scum on top.

Flow Path Through Intake and Screens Coarse screen trash rack Intake well with penstock Fine screen at pump well Jack well and pumps Conveyance main to treatment Design: Pipe diameter from Q = A V d = sqrt(4 Q / (pi V)), velocity 0.9 to 1.5 m/s Screen clear area = Q / velocity through screen (0.2 to 0.6 m/s) Intake must work at low flow and high flow and be protected from ice and floods Golden Rule Coarse screens stop trash, fine screens stop smaller matter; keep screen velocity low to avoid clogging.

8. Common Mistakes

  1. Many students think the intake pipe should draw from the bottom of the river; the bottom water carries heavy silt, and water should be drawn 2.5 to 3 metres below the surface.
  2. A frequent error is to forget that the intake must be located upstream of the sewage and drain outfalls so that the water drawn is not polluted.
  3. Some candidates calculate the intake pipe diameter from the average daily demand instead of the maximum daily demand plus the allowance for losses.
  4. Students often mix up the wet intake tower and the dry intake tower; in the wet tower the water level inside equals the river level, while in the dry tower the interior is kept dry.
  5. A common mistake is to allow too high a velocity through the screens; the velocity through fine screens should be only 0.2 to 0.6 m/s.
  6. Many candidates place the intake on the convex side of a river bend; the intake should be on the concave side where the flow is deep, though away from the erosion zone.
  7. Students frequently forget to increase the screen area for clogging, although a reduction of the clear area of 40 percent is a standard allowance.

9. Exam Tips

  1. Memorise the rule that water should be drawn 2.5 to 3 metres below the water surface to avoid both bottom silt and surface scum.
  2. Remember the permissible velocity ranges: 0.9 to 1.5 m/s in intake pipes and 0.2 to 0.6 m/s through fine screens.
  3. For numericals use the formula Q = A V, and remember to convert the maximum daily demand from MLD to cubic metres per second before finding the diameter.
  4. Note the four main types of intakes: river, reservoir, lake and canal intakes, and be able to state one characteristic of each.
  5. Remember that a wet intake tower is the more common type and that a reservoir intake has multiple level openings so that water of the best quality can be drawn.
  6. Learn the location criteria: deep part of the river, concave side of a bend, away from sewers, and a stable permanent bank.
  7. When screens are involved, first find the clear area from Q divided by the velocity through the screen, and then divide by the clogging factor of about 0.6 to get the gross area.

10. Conclusion

Intake structures are the gateways through which raw water enters a water supply scheme, and their correct location and design determine both the quality of the raw water and the economy of the entire scheme. In this chapter we have studied the requirements and location criteria of an intake, the various types of intakes for rivers, reservoirs, lakes and canals, the difference between wet and dry intake towers, and the design considerations including the size of the intake pipe and the screens. We have solved worked numerical examples on the diameter of the intake pipe and the clear area of the screens, and the quick revision tables summarise the standard values that must be remembered. The diagrams show the layout of a river intake and the flow path from the source to the treatment plant. This knowledge links the selection of the source, studied in the first chapter, with the conveyance and treatment of water, which follow in the later chapters. By memorising the standard depths, velocities and location rules, and by practising the pipe-sizing numericals, a candidate can answer intake-structure questions accurately and secure reliable marks in the environmental engineering section of the examination.