23.3 Quantity Estimation

Start MCQ Practice →

23.3 Quantity Estimation

Subject: Civil Engineering Chapter: Estimation & Construction Management Topic: 23.3 Quantity Estimation

1. Introduction

Quantity estimation, also called quantity surveying, is the process of computing the exact quantities of the various items of work such as earthwork, concrete, masonry, plastering and steel from the drawings of a project, before these quantities are multiplied by their rates to form the estimate. The quantity survey is the backbone of the detailed estimate, because an error in quantity is magnified by the rate and produces a wrong total cost, while a correct quantity with a wrong rate is easier to detect and correct. For a competitive examination candidate, quantity estimation is one of the most scoring numerical topics in the civil engineering paper, because questions on the volume of earthwork, the number of bricks, the quantity of concrete and the area of plastering are asked again and again in SSC JE and RRB JE examinations.

The computation of quantities follows a definite order so that nothing is missed. The work is measured in the sequence in which the items are executed, beginning with site clearance and earthwork in excavation, then foundation concrete, brickwork and masonry, then superstructure brickwork, lintels, roofs and floors, and finally plastering, finishing and painting. The quantities are entered in the measurement sheet with their length, breadth and height, and the totals are carried to the abstract. For every item, the estimator must apply the correct unit, the correct deduction rules for openings and the correct allowances for wastage, so that the purchased materials are neither insufficient nor excessive.

In this chapter we will study the methods of calculating quantities for the most important items of a building, namely earthwork, concrete, brickwork, plastering and steel reinforcement. We will learn the standard assumptions such as the number of bricks per cubic metre of brickwork, the mortar mix proportions and their effect on cement and sand quantities, and the mid-section and mean-section formulas for computing earthwork volumes in roads and canals. We will also solve worked numerical examples for each item, so that the candidate can reproduce the calculations confidently in the examination.

2. Earthwork Calculation

Earthwork is the excavation and filling of soil and is one of the most important items of any project, because its quantity can be enormous in road, railway, canal and building works. In building work, earthwork in excavation is measured for the trenches and pits of the foundation, while in road and canal works it is measured for the cutting and filling along the alignment. The unit of earthwork is the cubic metre. The excavation is computed from the cross-sectional area of the trench multiplied by its length, and for foundation trenches the width is taken slightly wider than the foundation so that working space is available on either side.

For longitudinal works such as roads and canals, the volume of earthwork between two consecutive cross sections is computed by either the mean sectional area method or the prismoidal formula. In the mean sectional area method, the average of the areas of the two end sections is multiplied by the distance between them, and this method is accurate when the ground surface is uniform. The mean section method computes the volume from the mean of the end heights and the mean of the widths, which is also called the trapezoidal rule. The prismoidal formula, which is more accurate, gives the volume as the distance divided by 6 multiplied by the sum of the end areas, four times the middle area and the last area.

For a foundation trench that is rectangular in cross section, the volume is simply the length multiplied by the width multiplied by the depth. When the sides of the trench slope, the cross section becomes a trapezoid, and its area is found by the formula that the area equals the top width plus the bottom width divided by two, multiplied by the depth. In building work the side slopes of trenches depend on the nature of the soil; hard soil is excavated vertically while loose or sandy soil requires sloping or shoring of the sides to prevent collapse.

3. Concrete, Brickwork and Plastering Quantities

Concrete is measured in cubic metres, and the quantity is obtained by multiplying the length, breadth and height of the member. For a slab, the quantity of concrete equals the plan area multiplied by the thickness of the slab. For a column, the quantity equals the cross-sectional area multiplied by the height, and for a beam or a foundation it is the width multiplied by the depth multiplied by the length. Once the volume of concrete is known, the quantities of cement, sand and aggregates are computed from the mix proportion, and the number of cement bags is found by dividing the cement required in kilograms by 50.

For a mix of 1:2:4, the total sum of the proportions is 7, and the quantity of cement in cubic metres per cubic metre of concrete is 1 divided by 7, which is 0.143 cubic metres, and after allowing for shrinkage the dry volume is taken as 1.54 times the wet volume. The weight of one cubic metre of cement is about 1440 kilograms, so the number of bags equals the cement volume in cubic metres multiplied by 1440 and divided by 50. Bricks are counted at the rate of about 500 per cubic metre of brickwork including mortar, and the quantity of mortar required per cubic metre of brickwork is roughly one third of the volume of the brickwork.

Plastering is measured in square metres, and the quantity of mortar is obtained by multiplying the plastering area by the thickness of the plaster. In the standard plaster of 12 millimetres thickness, the quantity of mortar per square metre is 0.012 cubic metres, and with a 1:6 mix the cement and sand are found from the proportion. For pointing, the quantity of mortar is taken as one third of the plaster mortar for the same area, because pointing fills only the joints and leaves the surface of the bricks exposed.

4. Worked Numerical Examples

Example 1: A building has a foundation trench 30 metres long, 1 metre wide and 1.2 metres deep. Compute the earthwork in excavation.

Solution: Volume of earthwork = length x width x depth = 30 x 1 x 1.2 = 36 cubic metres. The earthwork in excavation is 36 cubic metres.

Example 2: The cross sections of a road at two sections 20 metres apart have areas of 10 square metres and 14 square metres. Find the volume of earthwork by the mean sectional area method.

Solution: Mean area = (10 + 14) / 2 = 12 square metres. Volume = mean area x distance = 12 x 20 = 240 cubic metres.

Example 3: Determine the number of cement bags required for 10 cubic metres of concrete of mix 1:2:4, assuming the dry volume is 1.54 times the wet volume and the density of cement is 1440 kg per cubic metre.

Solution: Dry volume = 10 x 1.54 = 15.4 cubic metres. Sum of proportions = 1 + 2 + 4 = 7. Volume of cement = 15.4 x (1/7) = 2.2 cubic metres. Weight of cement = 2.2 x 1440 = 3168 kg. Number of bags = 3168 / 50 = 63.36, that is about 64 bags.

Example 4: A wall of 8 cubic metres is to be built. Find the number of bricks required at 500 bricks per cubic metre with 5 percent wastage.

Solution: Bricks required = 8 x 500 = 4000 bricks. Wastage at 5 percent = 4000 x 0.05 = 200 bricks. Total bricks = 4000 + 200 = 4200 bricks.

Example 5: A wall surface of 50 square metres is to be plastered with 12 millimetre thick plaster of mix 1:6. Compute the quantity of mortar and the cement required, taking 1 cubic metre of dry cement mortar for 1 cubic metre of wet plaster and the density of cement as 1440 kg per cubic metre.

Solution: Volume of plaster = 50 x 0.012 = 0.6 cubic metres. Dry volume with allowance = 0.6 x 1.33 = 0.798 cubic metres, approximately 0.8 cubic metres. Sum of proportions = 1 + 6 = 7. Volume of cement = 0.8 x (1/7) = 0.114 cubic metres. Weight of cement = 0.114 x 1440 = 164.2 kg. Number of bags = 164.2 / 50 = 3.28, that is about 4 bags.

5. Quick Revision Tables

Table 1: Standard Assumptions in Quantity Estimation

Item Standard value
Bricks per cubic metre of brickwork About 500
Weight of one bag of cement 50 kg
Density of cement 1440 kg/m3
Dry volume factor for concrete 1.54 times wet volume
Dry volume factor for mortar 1.33 times wet volume
Plaster thickness (common) 12 mm

Table 2: Quantities from Concrete Mixes

Mix proportion Sum of proportions Cement per m3 of concrete (dry, m3)
1:1.5:3 5.5 0.28
1:2:4 7 0.22
1:3:6 10 0.154
1:4:8 13 0.118

6. Mind Map

flowchart TD
    A[Quantity Estimation] --> B[Earthwork]
    A --> C[Concrete]
    A --> D[Brickwork]
    A --> E[Plastering]
    A --> F[Steel]
    B --> B1[Mean sectional area method]
    B --> B2[Prismoidal formula]
    C --> C1[Length x breadth x height]
    C --> C2[Dry volume 1.54 factor]
    D --> D1[500 bricks per m3]
    D --> D2[Centre line method]
    E --> E1[Area x thickness]
    E --> E2[1.33 dry factor]
    F --> F1[Weight = d x d / 162 per metre]
    B1 --> B1a[(A1 + A2) / 2 x distance]

7. Important Diagrams (SVG)

The following diagrams show the calculation of earthwork volume between two sections and the measurement of a rectangular foundation trench.

Earthwork between Two Cross Sections Section 1 Area A1 = 10 m2 Section 2 Area A2 = 14 m2 Distance = 20 m Volume by mean section method = (A1 + A2) / 2 x distance Volume = (10 + 14) / 2 x 20 = 240 cubic metres Golden Rule Earthwork volume = mean area of end sections multiplied by the distance between them.

Foundation Trench and Brickwork Width = 1 m Depth 1.2 m Foundation concrete bed Volume of trench = length x width x depth For 30 m length: 30 x 1 x 1.2 = 36 m3 Golden Rule Excavate to the depth of the foundation and allow working space on each side.

8. Common Mistakes

  1. Many students forget to apply the dry volume factor of 1.54 for concrete and use the wet volume directly, which gives a serious shortage of cement.
  2. A common error is to compute brickwork volume from internal dimensions; the correct quantity requires the centre line dimensions of the walls.
  3. Candidates often forget the wastage allowance on bricks and cement, so the estimated material is less than the actual requirement.
  4. Some students use the mean sectional area method even for widely spaced sections; the prismoidal formula is more accurate where the area varies considerably.
  5. A frequent mistake is to measure plastering as the gross area of the wall without deducting openings above the prescribed minimum size.
  6. Many candidates confuse the dry volume factor, using 1.54 for mortar instead of the correct 1.33 factor.
  7. In the prismoidal formula, students often forget to take four times the middle section area, which destroys the accuracy of the method.
  8. Candidates frequently compute steel weight without including the hooks and laps, or use the diameter in centimetres instead of millimetres in the d squared divided by 162 formula.

9. Exam Tips

  1. Memorise the standard assumptions: 500 bricks per cubic metre, 50 kg per bag, 1440 kg per cubic metre density of cement, and 1.54 dry factor for concrete.
  2. Practise the mid-section formula for earthwork because it is the most commonly examined volume problem in road and railway works.
  3. Remember that the dry volume factor for mortar is 1.33, while for concrete it is 1.54; this distinction is often tested.
  4. For steel, use the formula that the weight of a bar per metre equals the square of the diameter in millimetres divided by 162.
  5. Learn the cement content per cubic metre for the common mixes: 0.28 m3 for 1:1.5:3, 0.22 m3 for 1:2:4 and 0.154 m3 for 1:3:6.
  6. Always deduct openings from masonry and plastering areas above the specified limits, and add back the sides of openings as per the rules.
  7. Note that the prismoidal formula is also called the Simpson's rule and gives more accurate earthwork volumes than the mean sectional method.
  8. Practise computing the number of cement bags for a given volume of concrete quickly, because this appears frequently in numerical questions.

10. Conclusion

Quantity estimation is the practical heart of estimation and costing, because the accuracy of the entire estimate depends on the correctness of the quantities measured from the drawings. In this chapter we have studied the methods of computing the quantities of the principal building items, namely earthwork by the mean sectional area and prismoidal methods, concrete from the volume of members with the dry volume factor, brickwork from the standard of 500 bricks per cubic metre, plastering from the area and thickness, and steel from the d squared divided by 162 formula. We have solved worked numerical examples for each item and learned the standard assumptions and conversion factors that make the calculations quick and reliable. The quantities computed in this chapter form the raw material of the next topic of rate analysis, where these very quantities are combined with the rates of materials and labour to determine the cost of each item of work. A candidate who can compute quantities accurately has already secured a major share of the marks available in the numerical portion of the estimation and costing syllabus.