Subject: Civil Engineering Chapter: Foundation Engineering Topic: 19.6 Settlement of Foundations
A foundation must do more than merely stay safe against shear failure; it must also remain within acceptable limits of settlement, because excessive or non-uniform settlement damages the structure even when the soil has not failed. Settlement is the downward vertical movement of a foundation caused by the compression and deformation of the soil beneath it, and it is divided into three parts: immediate settlement, which occurs almost instantly as the soil deforms elastically; primary consolidation settlement, which occurs slowly in saturated clays as water is squeezed out of the pores; and secondary consolidation settlement, which occurs at a very slow rate after the pore pressures have dissipated, owing to the creep of the soil skeleton. For examination candidates, settlement is a high-yield topic because questions on the types of settlement, the calculation of consolidation settlement and the permissible limits of settlement are asked frequently.
The total settlement of a foundation in a clayey soil is the sum of the immediate, primary and secondary settlements, while in a sandy soil the settlement is predominantly immediate because sands drain quickly and do not undergo consolidation. The amount of settlement depends on the magnitude of the load, the compressibility of the soil, the size and shape of the footing, the thickness of the compressible stratum and the position of the water table. The settlement is also influenced by the pressure distribution, because the stress increase caused by the footing spreads out with depth and affects deeper layers only partially. Understanding these mechanisms allows the engineer to predict how much a building will settle and to design the foundation so that the total and differential settlements stay within the permissible values.
Two separate limits are used in design: the total settlement, which must not exceed a maximum value for the structure, and the differential settlement, which is the difference in settlement between adjacent foundations and is generally the more dangerous of the two, because unequal settlement causes tilting, cracking of walls and distortion of the structural frame. The permissible total settlement for an isolated footing on sand is commonly taken as 25 mm for ordinary structures, while for a raft foundation it is larger, of the order of 75 mm. This chapter explains the types of settlement, the theory of consolidation, the elastic settlement computation, and the worked numerical problems through which these concepts are examined.
Immediate settlement, also called elastic settlement, occurs at the instant the load is applied, because the soil deforms elastically and also because, in saturated fine-grained soils, no water has yet drained out of the pores. In sands the immediate settlement is the dominant component and is usually estimated from the elastic theory, using the modulus of elasticity and Poisson's ratio of the soil. The elastic settlement of a flexible footing is computed using the average vertical stress influence factor, which depends on the shape of the footing and the point at which the settlement is calculated, and the relationship shows that the settlement increases with the applied pressure and the width of the footing, and decreases as the modulus of elasticity of the soil increases.
The elastic settlement of a rigid footing is somewhat smaller than that of a flexible footing, because the rigid footing redistributes the pressure and settles uniformly. In practice, the immediate settlement in clays is small compared with the consolidation settlement and is often neglected, but in sands it forms almost the whole of the settlement. The modulus of elasticity of sand can be estimated from the standard penetration test N value using empirical correlations, and this is the basis of several well-known methods for estimating settlement in cohesionless soils. The important principle to remember is that the immediate settlement is practically independent of time and occurs as soon as the load comes on the foundation.
A rigid footing of width 2 m resting on a sandy soil with modulus of elasticity 20 MPa is subjected to a net bearing pressure of 120 kN/m2. Using the simplified relationship that the immediate settlement in millimetres equals the pressure in kN/m2 times the width in metres divided by the modulus in MPa, estimate the immediate settlement.
Solution:
Immediate settlement = pressure x width / modulus = 120 x 2 / 20 = 12 mm.
Therefore the immediate settlement is about 12 mm.
If the permissible total settlement for this footing is 25 mm, express the percentage of the permissible settlement consumed by the immediate settlement.
Solution:
Percentage = (12 / 25) x 100 = 48 percent.
Therefore nearly half of the permissible settlement is consumed by immediate settlement alone.
Primary consolidation settlement occurs in saturated clay layers when the applied load increases the pore water pressure, and the water is gradually squeezed out of the voids, transferring the load from the water to the soil skeleton. The process is described by the theory of one-dimensional consolidation, in which the coefficient of consolidation controls the rate of settlement and the compressibility of the soil controls the magnitude. The final consolidation settlement of a clay layer of thickness H under a stress increase is computed from the relationship that the settlement equals the change in void ratio divided by (1 plus the initial void ratio) multiplied by the thickness of the layer. When the soil is normally consolidated, the settlement is computed from the compression index Cc, and when it is overconsolidated, the swell index is used.
The stress increase with depth in the clay layer is not uniform, so in calculations the layer is divided into sub-layers and the average stress increase in each sub-layer is used, or an equivalent uniform stress is assumed. The coefficient of consolidation cv determines how rapidly settlement occurs: a high cv means that pore water escapes quickly and settlement is completed in a short time, while a low cv means that settlement may continue for years. The time required to achieve a given degree of consolidation is related to the time factor, which depends on the coefficient of consolidation, the drainage path length and the elapsed time, and a degree of consolidation of 50 percent corresponds to a time factor of about 0.197 while 90 percent corresponds to about 0.848 for uniform initial pore pressure.
A saturated clay layer of thickness 4 m has an initial void ratio of 0.8 and a compression index of 0.25. The stress increase at the middle of the layer is 50 kN/m2 and the initial effective overburden pressure at that depth is 100 kN/m2. Compute the consolidation settlement.
Solution:
Settlement = H x Cc x log10((initial pressure + stress increase) / initial pressure) / (1 + e0).
Settlement = 4 x 0.25 x log10((100 + 50) / 100) / (1 + 0.8).
Settlement = 1 x log10(1.5) / 1.8.
Settlement = 1 x 0.1761 / 1.8 = 0.0978 m = 97.8 mm.
Therefore the consolidation settlement is about 98 mm.
If the coefficient of consolidation cv of the layer is 5 x 10^-4 cm2/s and the layer is drained on both sides, estimate the time required for 50 percent consolidation. Use a time factor of 0.197.
Solution:
For double drainage, drainage path d = H/2 = 4/2 = 2 m = 200 cm.
Time factor Tv = cv x t / d2, so t = Tv x d2 / cv.
t = 0.197 x (200)2 / (5 x 10^-4).
t = 0.197 x 40000 / (5 x 10^-4) = 7880 / 5 x 10^-4 = 1.576 x 10^7 s.
Converting to years, t = 1.576 x 10^7 / (365 x 24 x 3600) = 0.5 years.
Therefore 50 percent consolidation is achieved in about half a year.
The total settlement of a foundation is the sum of the immediate and consolidation settlements, and for design it must be compared with the permissible values for the particular type of structure. Permissible total settlements commonly used in practice are about 40 mm for isolated footings on sand, 25 to 50 mm for footings on clay, and up to 75 mm for raft foundations, although these values vary with the codes of the country. The differential settlement between two adjacent columns is limited to a value that does not produce cracking of the structural frame or the partitions, and the angular distortion, which is the differential settlement divided by the distance between the foundations, is limited to about 1/300 for continuous brick walls and about 1/500 for framed structures.
Differential settlement is generally more critical than total settlement, because a uniform total settlement is comparatively harmless while a differential settlement rotates and distorts the structure. The engineer reduces differential settlement by using a raft foundation, which acts as a rigid plate and settles almost uniformly, by choosing a deeper foundation, or by adjusting the sizes of the individual footings so that all of them settle equally. The limit states for settlement are often the governing criterion in the design of foundations on soft clays, because a foundation may be safe against bearing capacity failure yet completely unacceptable because of large differential settlement. The numerical evaluation of settlement therefore completes the design process that began with the bearing capacity.
A framed building has two adjacent footings 4 m apart. If the permissible angular distortion is 1/500, find the maximum permissible differential settlement between the footings.
Solution:
Angular distortion = differential settlement / distance.
Maximum differential settlement = (1/500) x 4 = 0.008 m = 8 mm.
Therefore the differential settlement between the two footings must not exceed 8 mm.
If the computed differential settlement is 6 mm, express it as a percentage of the permissible value.
Solution:
Percentage = (6 / 8) x 100 = 75 percent.
Therefore the computed settlement uses 75 percent of the permissible differential settlement.
| Type | Time of Occurrence | Dominant Soil |
|---|---|---|
| Immediate (elastic) | At once, on loading | Sand, all soils |
| Primary consolidation | Slow, over months to years | Saturated clay |
| Secondary consolidation | Very slow, after primary | Soft clay, peat |
| Differential settlement | Difference between footings | All soils |
| Quantity | Formula | Example |
|---|---|---|
| Consolidation settlement | H x Cc x log10((p0 + dp)/p0)/(1 + e0) | 4 x 0.25 x log10(1.5)/1.8 = 0.098 m |
| Time factor | Tv = cv x t / d2 | 0.197 for 50 percent |
| Drainage path | d = H/2 for double drainage | 2 m |
| Angular distortion | Differential settlement / distance | 8 mm / 4 m = 1/500 |
| Elastic settlement | p x B / E | 120 x 2 / 20 = 12 mm |
flowchart TD
A[Settlement of Foundations] --> B[Immediate settlement]
A --> C[Consolidation settlement]
A --> D[Secondary settlement]
A --> E[Permissible limits]
B --> B1[Elastic, occurs at once]
B --> B2[Dominant in sand]
C --> C1[Saturated clay, slow]
C --> C2[Settlement = H Cc log10((p0+dp)/p0)/(1+e0)]
D --> D1[Creep of soil skeleton]
E --> E1[Total settlement limits]
E --> E2[Differential settlement limits]
E2 --> E3[Angular distortion = diff / distance]
C2 --> F[Rate governed by coefficient cv]
F --> F1[Tv = cv t / d2]
The following diagrams show the components of total settlement and the time-settlement curve during consolidation.
Settlement is the second pillar of foundation safety, standing beside bearing capacity, and this chapter has explained all its important aspects. We have seen that settlement is composed of immediate, primary consolidation and secondary consolidation components, that immediate settlement dominates in sands while consolidation settlement dominates in saturated clays, and that the magnitude of consolidation settlement is computed from the compression index and the stress increase. The worked examples have demonstrated the elastic settlement estimate for a footing on sand, the calculation of consolidation settlement using the logarithmic formula, the time required for a given degree of consolidation using the time factor, and the use of the angular distortion limit to fix the permissible differential settlement. A foundation that satisfies both the bearing capacity and the settlement criteria is a safe and serviceable foundation. With these quantitative tools at hand, the candidate is fully prepared to study pile foundations and well foundations, where the same principles of capacity and settlement are applied to deep structural members.