🏗️ Civil Engineering

13.10 Water Resources Assessment

Start MCQ Practice →

13.10 Water Resources Assessment

Subject: Civil Engineering Chapter: Hydrology Topic: 13.10 Water Resources Assessment

1. Introduction

Water resources assessment is the final and most applied chapter of hydrology, in which the concepts of the hydrologic cycle, precipitation, runoff and groundwater are brought together to estimate the quantity of water that is available for use from a river basin or a catchment. The assessment determines how much water can be reliably supplied from a source for irrigation, drinking water, hydroelectric power and industry, and it decides the size of the reservoirs and the storage capacity required to meet the demand. For a candidate preparing for civil engineering examinations such as SSC JE, RRB JE and state AE exams, water resources assessment is an important chapter, and questions on the water balance equation, the dependable yield, the mass curve or Ripple diagram and the flow duration curve appear regularly in numerical form.

The fundamental tool of water resources assessment is the water balance equation, which was introduced in the first chapter of this subject. For a river basin, the total inflow from precipitation and from the upstream areas is balanced by the outflow through the rivers, the evapotranspiration, the groundwater losses and the change in storage. When this balance is written over a long period, the change in storage is zero, and the dependable or firm yield of the basin can be estimated from the records of the stream flow. The assessment also considers the reliability of the supply, because the flow of a river varies greatly from year to year and from season to season.

In this chapter we will study the water balance equation and its application to a basin, the concept of the dependable yield and the firm yield, the mass curve or Ripple diagram method for the determination of the required reservoir capacity, the flow duration curve and the reservoir storage analysis, and the concept of safe yield of groundwater. We will also solve numerical problems on the water balance and on the mass curve method, since these are the standard examination problems of this chapter.

2. Water Balance and Dependable Yield

The water balance equation for a catchment states that the precipitation P is equal to the sum of the runoff R, the evapotranspiration E, the groundwater outflow G and the change in storage delta S, that is, P = R + E + G + delta S. Over a long period of years, the average change in storage is small and can be neglected, so that P = R + E + G. The runoff term R represents the usable water of the basin, because it is the water that can be stored in reservoirs and diverted to the users, while the evapotranspiration and the groundwater losses are not available for use. The water balance equation is therefore the basis for estimating the total water resources of a basin from the measured rainfall and stream flow.

The dependable yield of a river or a basin is the maximum quantity of water that can be supplied with a given degree of reliability over a specified period. The yield of a stream at any probability of exceedance is obtained from the flow duration curve, and the firm yield is the yield that is available even during the driest period of the record, that is, the yield with a very high degree of reliability. The reservoir that stores the flood flows must provide enough storage so that the firm yield can be supplied throughout the year, and the design of the reservoir capacity depends on the difference between the inflow and the demand. The analysis of the mass curve gives this required storage.

Example: The average annual rainfall over a catchment of 500 square kilometres is 150 cm, and the evapotranspiration is estimated as 90 cm per year. Determine the average annual runoff volume available from the catchment, neglecting groundwater losses and assuming no change in storage.

Solution: Using the balance equation P = R + E with G = 0 and delta S = 0, we get R = P - E = 150 - 90 = 60 cm = 0.60 m. The annual runoff volume = R x A = 0.60 x 500 x 10^6 = 300 x 10^6 cubic metres per year. The average annual runoff available from the catchment is 300 million cubic metres.

3. Mass Curve and Reservoir Capacity

The mass curve, also called the Ripple diagram, is a cumulative plot of the inflow of a stream against time, in which the cumulative inflow volume is plotted on the vertical axis and the time on the horizontal axis. The mass curve is constructed from the monthly or yearly flow records of the stream, and it is the principal tool for determining the storage capacity required in a reservoir to supply a given demand. When the demand line, drawn with a slope equal to the rate of demand, is placed on the mass curve, the maximum vertical difference between the demand line and the mass curve gives the required reservoir capacity.

The procedure is as follows: the mass curve is drawn by plotting the cumulative inflow against time; the demand line is drawn as a straight line from the point where the cumulative inflow equals the cumulative demand, with a slope equal to the rate of demand; the greatest vertical distance between the demand line and the mass curve over the critical dry period is the required storage capacity. The mass curve method is also used to find the firm yield for a given storage, and the critical period of the record, which is the longest sequence during which the inflow is less than the demand, determines the required storage. The method assumes that the future inflows will repeat the recorded pattern, which is the main limitation of the approach.

Example: The cumulative inflow of a stream at the beginning of each month is 0, 10, 22, 38, 56, 74, 90, 104, 116, 126, 134, 140 and 148 million cubic metres over 12 months. If the demand is a constant 11 million cubic metres per month, determine the required reservoir storage.

Solution: The cumulative demand at the end of each month is 11, 22, 33, 44, 55, 66, 77, 88, 99, 110, 121 and 132 million cubic metres. The difference between the cumulative inflow and the cumulative demand at the end of each month is 10 - 11 = -1, 22 - 22 = 0, 38 - 33 = 5, 56 - 44 = 12, 74 - 55 = 19, 90 - 66 = 24, 104 - 77 = 27, 116 - 88 = 28, 126 - 99 = 27, 134 - 110 = 24, 140 - 121 = 19 and 148 - 132 = 16 million cubic metres. The maximum deficit is 1 million cubic metres in the first month, and the largest surplus is 28 million cubic metres. The required storage is the maximum deficit over the critical period, which is 1 million cubic metres for this uniform record; in practice the storage is determined from the longest sequence of months during which the demand exceeds the inflow.

4. Flow Duration Curve and Groundwater Safe Yield

The flow duration curve is a plot that shows the percentage of time during which the flow of a stream equals or exceeds a given value, and it is constructed by arranging all the daily, weekly or monthly flows in descending order and plotting the flow against the percentage of time it is equalled or exceeded. The flow duration curve gives the dependable yield of the stream at any desired reliability: the flow that is equalled or exceeded 90 percent of the time is the dependable yield for 90 percent reliability, while the flow exceeded 50 percent of the time is the median flow. The flow duration curve is used to determine the firm yield, the dependable power output and the minimum flow required for environmental purposes, and the shape of the curve indicates the variability of the stream flow.

The safe yield of a groundwater basin is the maximum quantity of water that can be withdrawn from the basin annually without depleting the storage and without causing an adverse effect such as the intrusion of sea water or the permanent lowering of the water table. The safe yield is generally less than the average annual recharge, so that a part of the recharge is always left in storage to maintain the groundwater levels. The assessment of the groundwater resources requires the estimation of the annual recharge from rainfall, which is the rainfall multiplied by the infiltration factor, minus the losses. The groundwater balance of the basin is then written in the same way as the surface water balance, with the recharge on the inflow side and the withdrawals and the natural discharge on the outflow side.

The complete water resources assessment of a basin therefore combines the surface water and the groundwater estimates. The total water resources are the sum of the dependable surface runoff and the safe groundwater yield, and the available resources are compared with the present and future demands to decide the development strategy. The assessment also identifies the months of surplus and deficit, the need for storage and inter-basin transfer, and the measures of conservation such as the construction of check dams, the artificial recharge of groundwater and the efficient use of irrigation water. For the examinations, the important points are the mass curve construction, the flow duration curve, and the balance equations of the surface and groundwater.

5. Quick Revision Tables

Table 1: Water Balance Components and Yields

Term Symbol Meaning Use
Precipitation P Total rainfall input Primary inflow
Evapotranspiration E Loss to atmosphere Must be deducted
Runoff R Water in streams Usable resource
Groundwater outflow G Deep losses Deducted in balance
Dependable yield - Flow at a given reliability Supply planning
Firm yield - Yield in driest period Reservoir design

Table 2: Tools of Water Resources Assessment

Tool Type Purpose Construction
Mass curve (Ripple diagram) Graphical Reservoir storage capacity Cumulative inflow vs time
Flow duration curve Statistical Dependable yield Flow vs percentage exceedance
Water balance equation Analytical Basin resources P = R + E + G + dS
Safe yield analysis Analytical Groundwater withdrawal Recharge minus losses

6. Mind Map

flowchart TD
    A[Water Resources Assessment] --> B[Water balance]
    A --> C[Yield concepts]
    A --> D[Mass curve]
    A --> E[Flow duration curve]
    A --> F[Groundwater yield]
    B --> B1[P = R + E + G + dS]
    C --> C1[Dependable yield]
    C --> C2[Firm yield]
    D --> D1[Cumulative inflow vs time]
    D --> D2[Required reservoir capacity]
    E --> E1[Flow vs % time exceeded]
    E --> E2[Dependable flow at 90%]
    F --> F1[Safe yield]
    F --> F2[Recharge estimation]

7. Important Diagrams (SVG)

The following diagrams show the mass curve method of reservoir sizing and the flow duration curve.

Mass Curve (Ripple Diagram) for Reservoir Capacity Cumulative inflow Time Mass curve (inflow) Demand line Storage required Golden Rule The maximum vertical gap between the demand line and the mass curve gives the reservoir capacity.

Flow Duration Curve Flow (cumec) Percentage of time flow is exceeded Flow exceeded 90% of time 90% Flow exceeded 50% is the median flow Golden Rule The flow exceeded 90 percent of the time is the dependable yield at high reliability.

8. Common Mistakes

  1. Many students use the total rainfall as the available water without deducting evapotranspiration and losses; the usable water is the runoff component only.
  2. A frequent error is to neglect the change in storage in the short-term balance; delta S is negligible only for long-term averages.
  3. Some candidates draw the demand line of the mass curve with the wrong slope; its slope must equal the rate of demand.
  4. Students often take the vertical gap between the inflow curve and the demand line at a single point as the storage; the required storage is the maximum deficit over the critical period.
  5. It is wrong to say that the firm yield is the yield at 50 percent reliability; the firm yield is the yield available in the driest period of the record.
  6. A common mistake is to state that the safe yield can equal the total annual recharge; the safe yield must be less than the recharge to avoid depletion.
  7. Many candidates read the flow duration curve wrongly by taking the horizontal axis as the time; the horizontal axis is the percentage of time exceeded.
  8. Students frequently add the deep groundwater losses as part of the usable yield; such losses must be deducted in the water balance.

9. Exam Tips

  1. Memorise the water balance equation P = R + E + G + delta S and its long-term form P = R + E + G.
  2. Learn the mass curve construction and remember that the maximum vertical gap between the demand line and the mass curve gives the required storage.
  3. Know that the slope of the demand line equals the rate of demand on the mass curve.
  4. Remember that the flow duration curve gives the dependable yield at the chosen reliability, such as the flow exceeded 90 percent of the time.
  5. Practise one water balance numerical with the area and depth conversion, converting centimetres to metres.
  6. Note that the firm yield is the yield in the driest period, and it is lower than the median yield.
  7. Remember that the safe yield of a groundwater basin is less than the annual recharge.
  8. Link the mass curve method to the reservoir capacity and to the design of the dam and the spillway of the next chapter.

10. Conclusion

Water resources assessment is the application of all the hydrologic concepts of the earlier chapters to the practical problem of deciding how much water is available and how much storage is required to use it. In this chapter we have studied the water balance equation and its application to the estimation of the basin resources, the concepts of dependable yield and firm yield, the mass curve or Ripple diagram method for the determination of the required reservoir capacity, the flow duration curve for the estimation of the dependable flow, and the safe yield of groundwater. We have also solved numerical problems on the water balance and on the mass curve method. The candidate should remember the balance equation, the mass curve construction, the flow duration curve and the safe yield concept as the core revision points. Water resources assessment thus completes the hydrology syllabus by linking the hydrologic cycle, precipitation, runoff, hydrographs, floods and groundwater into a single practical framework, and it is essential for the design of all water resource development projects.