🏗️ Civil Engineering

Dams and Reservoirs

Start MCQ Practice →

Dams and Reservoirs

Subject: Civil Engineering Chapter: Irrigation Engineering Topic: 14.8 Dams and Reservoirs

1. Introduction

A dam is a barrier constructed across a river or stream to impound water, raising its level and creating a reservoir from which water can be supplied for irrigation, power generation, water supply and flood control. Dams are among the largest and most important structures built by civil engineers, and their failure can cause catastrophic loss of life and property. The reservoir behind a dam stores water during periods of high flow and releases it during periods of low flow, so that irrigation water is available throughout the year. For competitive examinations, dams and reservoirs contribute questions on the classification of dams, the forces acting on a gravity dam, the stability requirements and the methods of reservoir capacity estimation.

Dams can be classified in several ways. Based on the material of construction, they are divided into rigid dams, which include gravity dams, arch dams, buttress dams and hollow dams built of masonry or concrete, and non-rigid dams, which include earth dams and rockfill dams built of soil and rock. Based on the hydraulic design, dams are classified as overflow dams, which allow water to pass over their crest, and non-overflow dams, which keep water below their crest. Based on the purpose, dams are divided into single-purpose dams and multipurpose dams. The choice of the type of dam depends upon the topography, the foundation conditions, the availability of material and the head required.

In this chapter we will study the classification of dams, the various forces that act on a gravity dam, the stability and safety requirements of a gravity dam, the causes of dam failure, and the estimation of reservoir capacity. We will also solve numerical problems on the forces acting on a dam and on reservoir capacity estimation.

2. Types of Dams

A gravity dam is a massive structure of masonry or concrete which resists the water pressure entirely by its own weight. Its cross-section is roughly triangular, widest at the base, and it is stable because the resultant of all the forces acting on it falls within the middle third of the base. Gravity dams are the most common type of rigid dam and are suitable where the foundation rock is strong enough to carry the enormous weight. An arch dam is a curved structure, convex towards the upstream side, which transmits most of the water pressure to the sides of the valley by arch action; it is economical where the valley is narrow and the abutments are strong. A buttress dam consists of an inclined deck supported on a series of buttresses spaced along the dam, and it is lighter than a gravity dam because it uses less material.

Earth dams and rockfill dams are non-rigid dams built of locally available soil and rock. An earth dam is built of impervious soil with a carefully designed central impervious core and outer pervious zones, and its slopes are flat to keep it stable. A rockfill dam is built of loose rock with an impervious core or upstream facing, and it is more flexible than an earth dam so that it can tolerate small foundation settlements. Non-rigid dams are generally cheaper than concrete dams, but they require careful control of seepage and must not be overtopped, because their surfaces are easily eroded by flowing water.

The site selection of a dam is governed by the width of the valley, the strength of the foundation, the availability of construction materials, the storage capacity required and the distance from the area to be benefited. A narrow valley with strong rock abutments is ideal for an arch dam, a broad valley with good rock foundation suits a gravity dam, and a wide valley with pervious soils may require an earth dam. The reservoir so formed must have a small surface area relative to its volume to reduce evaporation losses, and the land submerged should be as little as possible.

3. Forces Acting on a Gravity Dam and Stability

The principal forces acting on a gravity dam are the water pressure, the uplift pressure, the weight of the dam, the earth and silt pressure, the earthquake forces and the temperature effects. The water pressure acts horizontally on the upstream face and is greatest at the base; its magnitude per unit length of the dam is half the product of the unit weight of water and the square of the water depth. The uplift pressure acts vertically upward on the base of the dam because of the seepage of water under the foundation, and it reduces the effective weight of the dam. The weight of the dam acts vertically downward through its centre of gravity and is the main stabilizing force.

For a gravity dam to be safe, it must satisfy the requirements of stability against overturning, sliding, and crushing. The resultant of all the forces must pass within the middle third of the base, so that the entire base remains in compression and no tensile stress develops, because masonry and concrete are weak in tension. The factor of safety against overturning is the ratio of the resisting moments to the overturning moments, and it must be greater than 1.5. The factor of safety against sliding is the ratio of the frictional resistance to the horizontal forces, and the maximum compressive stress at the base must not exceed the allowable stress of the foundation and the dam material.

Worked example: A rectangular concrete gravity dam of height 10 m has a base width of 6 m and stores water to its full height on the upstream side. Taking the unit weight of water as 9.81 kN per cubic metre and the unit weight of concrete as 24 kN per cubic metre, determine the water pressure force, the weight of the dam and the overturning and resisting moments per metre length.

Solution: 1. Water pressure P = 0.5 x 9.81 x 10 x 10 = 490.5 kN per metre, acting at a height of 10/3 = 3.33 m above the base. 2. Weight of dam W = 24 x 6 x 10 = 1440 kN per metre, acting at a distance of 3 m from the downstream toe. 3. Overturning moment = 490.5 x 3.33 = 1635 kN-m. 4. Resisting moment = 1440 x 3 = 4320 kN-m. 5. Factor of safety against overturning = 4320 / 1635 = 2.64, which is safe since it exceeds 1.5.

4. Reservoir Capacity and a Worked Example

The capacity of a reservoir is the volume of water it can store, and it is estimated by the area-elevation method or the mass curve method. In the area-elevation method, the plan area of the reservoir at various water levels is found from contour plans, and the volume between two successive levels is computed as the average of the two areas multiplied by the difference in level. The total capacity is the sum of the volumes of all such horizontal slices from the bed to the highest water level. In the mass curve or Ripple method, the cumulative inflow and the cumulative demand are plotted against time, and the maximum difference between the cumulative demand and the cumulative inflow gives the required storage.

The capacity of a reservoir is the sum of the live storage, which is the usable water between the highest and the lowest working levels, and the dead storage, which is the water kept below the lowest outlet to trap silt and provide head. The gross storage is the total volume below the highest water level. The trap efficiency of a reservoir is the ratio of the sediment trapped to the total sediment entering, and it is used to estimate the rate at which the dead storage is filled by silt. The design life of the reservoir is the period for which the dead storage is expected to accommodate the siltation.

Worked example: The water spread areas of a reservoir at elevations 100 m, 105 m and 110 m are 10, 15 and 22 square kilometres respectively. Determine the capacity of the reservoir between the elevations 100 m and 110 m.

Solution: 1. Volume between 100 and 105 m = average area x height = ((10 + 15) / 2) x 5 = 12.5 x 5 = 62.5 square kilometre-metres = 62.5 million cubic metres. 2. Volume between 105 and 110 m = ((15 + 22) / 2) x 5 = 18.5 x 5 = 92.5 million cubic metres. 3. Total capacity = 62.5 + 92.5 = 155 million cubic metres.

Worked example: A reservoir has a capacity of 120 million cubic metres and its dead storage is 20 million cubic metres. If the annual sediment inflow is 1.5 million cubic metres and the trap efficiency is 90 percent, find the period in which the dead storage will be filled.

Solution: 1. Annual sediment trapped = 0.90 x 1.5 = 1.35 million cubic metres per year. 2. Period to fill dead storage = 20 / 1.35 = 14.8 years.

5. Quick Revision Tables

Table 1: Classification of Dams

Basis Types Example
Material Rigid and non-rigid Concrete gravity; earth dam
Hydraulic design Overflow and non-overflow Spillway dam; solid dam
Structural action Gravity, arch, buttress Triangular section; curved dam
Purpose Single and multipurpose Irrigation only; irrigation and power

Table 2: Reservoir Storage Terms

Term Definition
Gross storage Total volume below the highest water level
Live storage Usable storage between lowest and highest working levels
Dead storage Storage below the lowest outlet for silt
Trap efficiency Sediment trapped / sediment entering
Design life Time for dead storage to fill with silt

6. Mind Map

flowchart TD
    A[Dams and Reservoirs] --> B[Types of dams]
    A --> C[Forces on gravity dam]
    A --> D[Stability requirements]
    A --> E[Reservoir capacity]
    A --> F[Causes of dam failure]
    B --> B1[Gravity dam]
    B --> B2[Arch dam]
    B --> B3[Earth and rockfill dam]
    C --> C1[Water pressure]
    C --> C2[Uplift pressure]
    C --> C3[Weight of dam]
    D --> D1[No overturning]
    D --> D2[No sliding]
    D --> D3[No tension, middle third]
    E --> E1[Area-elevation method]
    E --> E2[Mass curve method]
    E --> E3[Live and dead storage]
    F --> F1[Overtopping]
    F --> F2[Seepage and piping]

7. Important Diagrams (SVG)

The following diagrams show the typical gravity dam section and the reservoir storage zones.

Gravity Dam Cross-Section and Forces WATER P water pressure W weight of dam U uplift pressure at base base width b Resultant must pass within the middle third of the base. Golden Rule The resultant must lie within the middle third to avoid tension at the base.

Reservoir Storage Zones HIGHEST WATER LEVEL (HWL) LIVE STORAGE usable water DEAD STORAGE below lowest outlet, traps silt RIVER BED drawdown lowest working level Gross storage = live storage + dead storage Golden Rule Dead storage is reserved for silt and cannot be used for irrigation.

8. Common Mistakes

  1. Many students think a gravity dam resists water pressure by arch action, but it resists by its own weight.
  2. A frequent error is to forget the uplift pressure at the base, which reduces the effective weight of the dam.
  3. Some candidates believe dams can be built on any foundation, but a gravity dam needs strong rock while weak soil requires an earth dam.
  4. Students often think earth dams can be overtopped safely, but overtopping erodes and destroys earth dams.
  5. A common mistake is to use the total depth of the dam instead of the depth of water when computing the water pressure.
  6. Many candidates do not understand that if the resultant falls outside the middle third, tension develops at the base and the dam can crack.
  7. Students often confuse live storage with gross storage; live storage is the usable part between the working levels.

9. Exam Tips

  1. Memorise the classification of dams by material, hydraulic design and structural action, as classification questions are common.
  2. Remember the water pressure formula P = 0.5 gamma H squared, acting at a height of H/3 above the base.
  3. Note that the factor of safety against overturning is the ratio of resisting moment to overturning moment and must exceed 1.5.
  4. For reservoir capacity, use the average-end-area formula: volume equals average of two areas times the height between them.
  5. Remember that the mass curve method is also called the Ripple method and is used to find the required storage.
  6. Learn that trap efficiency relates the silt trapped to the silt entering and fixes the design life of the reservoir.
  7. For stability, remember the middle third rule and that masonry is weak in tension.

10. Conclusion

Dams and reservoirs convert the seasonal flow of rivers into a dependable year-round supply of water, and they are therefore the heart of almost every irrigation project. In this chapter we have studied the classification of dams into gravity, arch, buttress, earth and rockfill types, the forces of water pressure, uplift, weight, silt and earthquake that act on a gravity dam, and the stability requirements of no overturning, no sliding and no tension under the middle third rule. We have also studied how the capacity of a reservoir is estimated by the area-elevation method and the mass curve method, and how the live and dead storage divide the total storage. The worked examples on the forces on a dam and the reservoir capacity give the numerical practice that examinations demand. These concepts carry forward into the design of spillways and energy dissipation structures, where the flood water stored behind the dam is safely released, and they form an essential part of the irrigation engineering syllabus.

10.1 Additional Worked Examples

Worked example: A reservoir has the following areas at successive elevations: at 90 m, 5 square km; at 92 m, 8 square km; at 94 m, 12 square km. Find the capacity between 90 m and 94 m in million cubic metres.

Solution: 1. Volume 90 to 92 m = ((5 + 8) / 2) x 2 = 13 million cubic metres. 2. Volume 92 to 94 m = ((8 + 12) / 2) x 2 = 20 million cubic metres. 3. Total capacity = 13 + 20 = 33 million cubic metres.