1. Introduction

Sewage treatment is the process of removing the impurities from sewage so that the treated effluent can be discharged into a stream or on land without creating a nuisance or endangering public health. Sewage cannot be discharged in its raw state, because its organic matter would consume the dissolved oxygen of the receiving stream, its suspended solids would form sludge banks, and its pathogenic organisms would spread disease. The object of sewage treatment is therefore to remove the suspended solids, to stabilise the organic matter, to remove the pathogenic organisms and to produce an effluent that satisfies the quality standards of the receiving water body.

The treatment of sewage is carried out in a definite sequence, and the whole sequence is called the flow diagram of sewage treatment. The treatment processes are grouped according to the degree of treatment they provide. Preliminary treatment removes the large and heavy material such as rags, sticks, grit and sand; primary treatment removes the settleable suspended solids in sedimentation tanks; secondary treatment removes the dissolved and colloidal organic matter by the action of micro-organisms; and tertiary treatment, also called advanced treatment, produces a very high quality effluent for reuse.

In this chapter we will study the principles of each stage of treatment, the layout of a typical treatment plant, the important terms such as screening, grit removal, sedimentation and biological treatment, and the disposal of the treated effluent into natural streams. Numerical examples on the sizing of a grit chamber and on the computation of the area of a sedimentation tank are included, because such design calculations are frequently tested in examinations.

2. Preliminary and Primary Treatment

Preliminary treatment is the first stage, whose purpose is to remove the coarse and heavy material that would damage the pumps, block the pipes and overload the later units. The preliminary units are screens, grit chambers and skimming tanks. Screens are bars or gratings placed across the flow that remove the large floating and suspended matter such as rags, paper, sticks and plastic, and the screenings removed are burned or buried. The clear spacing between the bars of a coarse screen is about 50 to 75 mm, while a fine screen has clear openings of about 25 mm or less, and the screens are cleaned either manually or mechanically.

The grit chamber is the unit that removes the heavy mineral particles such as sand and gravel, which would otherwise settle in the pipes and damage the pumps by abrasion. The grit chamber is designed to slow down the velocity of the sewage to about 0.15 to 0.3 m/s, at which velocity the sand settles to the bottom but the lighter organic solids are carried forward. The velocity of flow in a grit chamber is controlled near the critical velocity so that the organic matter is not removed with the grit, and the grit collected is washed and used as fill material. Skimming tanks are used to remove the floating grease and oil from the surface of the sewage, either by blowing air or by allowing the oil to rise to the surface and be skimmed off.

Primary treatment consists of the plain sedimentation of the sewage in primary settling tanks, in which the settleable suspended solids settle to the bottom and are removed as primary sludge. The primary sedimentation tank is designed for a detention period of about 1.5 to 2 hours and a surface loading of about 40,000 to 50,000 litres per square metre per day, and with these conditions it removes about 30 to 40 percent of the BOD and about 50 to 70 percent of the suspended solids. The primary sludge is rich in organic matter and is pumped to the sludge treatment units, while the clarified effluent passes on to the secondary treatment.

3. Secondary and Tertiary Treatment

Secondary treatment is the biological treatment that removes the dissolved and colloidal organic matter which cannot be removed by plain settling. The principle of secondary treatment is that aerobic micro-organisms are brought into contact with the sewage in the presence of oxygen, and they use the organic matter as food, converting it into carbon dioxide, water and new micro-organisms. The two principal methods of secondary treatment are the activated sludge process and the trickling filter process, which are studied in detail in the chapter on secondary treatment.

The activated sludge process consists of an aeration tank in which the sewage is mixed with a culture of micro-organisms called activated sludge and air is supplied either by mechanical aerators or by diffused air through aeration units. The mixed liquor is then sent to a secondary settling tank, where the biological solids settle out, and a part of the settled sludge, called the return sludge, is returned to the aeration tank to maintain the population of micro-organisms, while the excess sludge is wasted. The trickling filter is a bed of coarse material such as broken stones or synthetic media, over which the sewage is sprayed, and a slime of micro-organisms grows on the stones and oxidises the organic matter as the sewage trickles past.

After secondary treatment, the effluent may still contain nutrients such as nitrogen and phosphorus and a small amount of organic matter, and when a very high quality effluent is required, tertiary or advanced treatment is provided. Tertiary treatment includes processes such as chemical coagulation, filtration through sand or activated carbon, chlorination and nutrient removal, and it produces an effluent suitable for industrial reuse or for discharge into a sensitive water body. The degree of treatment chosen depends on the assimilative capacity of the receiving stream, the use of the water downstream and the standards fixed by the pollution control authorities.

4. Disposal of the Treated Effluent

The treated effluent is disposed of either by dilution in a natural water body such as a river or the sea, or by land application such as irrigation. The method of disposal depends on the flow of the stream, its quality, the degree of treatment and the local conditions. When the effluent is discharged into a river, the river must have enough flow to provide the required dilution and enough re-aeration to keep the dissolved oxygen above the minimum level needed by the fish and the river life. The self-purification of a stream is the natural ability of the stream to purify itself by the combination of dilution, sedimentation, oxidation and the action of aquatic plants.

The capacity of a stream to assimilate the pollution load is expressed by the concept of the dissolved oxygen sag, which was introduced in the chapter on the characteristics of sewage. When the organic load is discharged, the DO falls to a minimum at the point of maximum deficit, and if the stream is overloaded, this minimum may fall to zero, killing the fish and producing anaerobic conditions with foul smells. The discharge of the effluent must therefore be limited so that the DO of the stream never falls below the prescribed minimum, and this is done by requiring the sewage to be treated to a standard that matches the flow of the stream.

When sewage is disposed of by irrigation, the treated sewage is applied to the land, where the soil and the plants use the water and the nutrients, and the organic matter is stabilised by the micro-organisms of the soil. Sewage farming is an economical method in arid regions because it provides both water and fertiliser to the crops, but the sewage must be treated and the crops that are eaten raw must not be grown in it. The area of land required for sewage disposal is designed so that the hydraulic load of the applied sewage is within the capacity of the soil to absorb it, and the area is computed from the evapotranspiration and the allowable loading rate.

Problem: A grit chamber is to be designed for a sewage flow of 0.2 cubic metres per second with a detention period of 60 seconds. Find the volume of the grit chamber.

Solution: Volume = Flow x Detention period = 0.2 x 60 = 12 cubic metres.

Answer: The required volume of the grit chamber is 12 cubic metres.

Problem: A primary sedimentation tank receives a flow of 8 million litres per day and is designed for a surface loading of 40,000 litres per square metre per day. Find the surface area required and the diameter of a circular tank.

Solution: Surface area = Flow / Surface loading = 8,000,000 / 40,000 = 200 square metres. For a circular tank, area = pi x D squared / 4, so D = sqrt(4 x 200/3.1416) = sqrt(254.6) = 15.96 m.

Answer: The required surface area is 200 square metres and the diameter is about 16 m.

Problem: A tank is designed for a detention period of 2 hours and a flow of 2000 cubic metres per day. Find the volume and check the surface loading if the surface area is 100 square metres.

Solution: Volume = Flow x Detention time = (2000/24) x 2 = 83.33 x 2 = 166.67 cubic metres. Surface loading = Flow/Area = 2000/100 = 20 cubic metres per square metre per day = 20,000 litres per square metre per day.

Answer: The volume is 166.67 cubic metres and the surface loading is 20,000 litres per square metre per day.

5. Quick Revision Tables

Table 1: Stages of Sewage Treatment

Stage Units Main function Removal
Preliminary Screens, grit chamber, skimming Remove coarse and heavy matter Rags, grit, oil
Primary Primary settling tank Sedimentation 30-40 percent BOD, 50-70 percent SS
Secondary Activated sludge or trickling filter Biological oxidation 85-95 percent BOD
Tertiary Filters, coagulation, chlorination Advanced polishing Nutrients, pathogens

Table 2: Design Values of Treatment Units

Unit Design parameter Standard value
Grit chamber Velocity of flow 0.15 to 0.3 m/s
Primary tank Detention period 1.5 to 2 hours
Primary tank Surface loading 40,000 to 50,000 l/sq.m/day
Screen spacing Coarse screen clear opening 50 to 75 mm
Secondary settling Detention period 2 hours

6. Mind Map

flowchart TD
    A[Sewage Treatment] --> B[Preliminary treatment]
    A --> C[Primary treatment]
    A --> D[Secondary treatment]
    A --> E[Tertiary treatment]
    A --> F[Disposal of effluent]
    B --> B1[Screens]
    B --> B2[Grit chamber]
    B --> B3[Skimming tank]
    C --> C1[Primary settling tank]
    C --> C2[Detention 1.5 to 2 h]
    D --> D1[Activated sludge process]
    D --> D2[Trickling filter]
    E --> E1[Coagulation and filtration]
    E --> E2[Chlorination]
    F --> F1[Dilution in river]
    F --> F2[Irrigation on land]
    D1 --> G[Aeration tank and settling tank]
    D2 --> H[Slime on stones oxidises organic matter]

7. Important Diagrams (SVG)

The following diagrams show the flow diagram of a conventional sewage treatment plant and the layout of the activated sludge process.

Flow Diagram of a Sewage Treatment Plant Screens remove rags Grit chamber removes sand Primary tank settling Secondary treatment biological oxidation Sludge treatment digestion Treated effluent to river or irrigation Golden Rule Treatment proceeds from coarse to fine: screening, grit, settling and biology.

Layout of the Activated Sludge Process Primary effluent from settling tank Aeration tank air + micro-organisms Secondary tank settling of solids Return sludge back to aeration tank Excess sludge wasted Air supply by diffusers or mechanical aerators Golden Rule Return sludge maintains the population of micro-organisms in the aeration tank.

8. Common Mistakes

  1. Many students believe that secondary treatment removes suspended solids only; secondary treatment removes the dissolved and colloidal organic matter.
  2. A frequent error is to design the grit chamber for the velocity of the sewage in the main sewer; the grit chamber velocity is reduced to 0.15 to 0.3 m/s.
  3. Some candidates forget that the primary settling tank removes only 30 to 40 percent of the BOD and quote a higher figure.
  4. Students often confuse the return sludge with the wasted sludge; the return sludge maintains the biomass while the wasted sludge is removed from the system.
  5. A common mistake is to think that chlorination is a primary treatment; chlorination of the effluent is a tertiary or final disinfection step.
  6. Many candidates omit the skimming tank from the flow diagram and forget that grease and oil must be removed early in the treatment.
  7. Some students believe that the treated effluent can be discharged anywhere; the discharge must match the assimilative capacity of the receiving stream.
  8. Another recurring error is to ignore the units when computing the surface loading; flow in litres per day must be divided by the area in square metres.

9. Exam Tips

  1. Remember the sequence of treatment units: screens, grit chamber, skimming tank, primary settling, secondary treatment, tertiary treatment.
  2. Memorise the design values: grit chamber velocity of 0.15 to 0.3 m/s, primary tank detention of 1.5 to 2 hours and surface loading of 40,000 to 50,000 litres per square metre per day.
  3. Note the removals: the primary tank removes 30 to 40 percent BOD and 50 to 70 percent suspended solids.
  4. Remember that secondary treatment is biological oxidation and removes about 85 to 95 percent of the BOD.
  5. In numerical problems, use Volume = Flow x Detention time and Area = Flow / Surface loading, with the units kept consistent.
  6. Remember that the coarse screen has clear openings of 50 to 75 mm and a fine screen of 25 mm or less.
  7. Note that disposal of the effluent is done by dilution in a river or by irrigation on land, and the river must provide the required dilution.
  8. Understand the oxygen sag concept for the disposal problem, because the DO of the stream must never fall below the minimum level.

10. Conclusion

Sewage treatment is the process that makes the safe return of waste water to nature possible, and it is the heart of public health engineering because it protects the rivers, the ground water and the public health of the people who live downstream. In this chapter we have studied the complete sequence of treatment, starting with the preliminary units of screens and grit chambers, moving to the primary settling tank, and then to the biological secondary treatment, and finally to the tertiary polishing units. We have examined the methods of disposing of the treated effluent by dilution and by irrigation, and we have solved numerical problems on the sizing of a grit chamber and a primary settling tank. The flow diagram of the treatment plant and the layout of the activated sludge process have been presented as diagrams, so that the candidate can reproduce the sequence quickly in the examination. With this understanding of the overall scheme, the next chapters examine each stage in detail, beginning with the primary treatment units.