16.7 Primary Treatment

Subject: Civil Engineering Chapter: Public Health Engineering Topic: 16.7 Primary Treatment

1. Introduction

Primary treatment is the second stage of sewage treatment, which follows the preliminary treatment and precedes the biological secondary treatment. Its purpose is to remove the settleable suspended solids from the sewage by the process of plain sedimentation, and it does this in large tanks called primary settling tanks, primary clarifiers or plain sedimentation tanks. The sewage that enters the primary settling tank has already passed through the screens and the grit chamber, so it contains the fine suspended solids, the colloidal matter, the dissolved organic matter and the micro-organisms, and of these the primary tank removes only the fraction that can settle under gravity.

Primary treatment is both simple and economical, because no chemicals or external energy are added and the process relies on the natural tendency of heavy particles to settle. A properly designed primary settling tank removes about 30 to 40 percent of the BOD and about 50 to 70 percent of the suspended solids, and the settled solids are scraped to the bottom of the tank and removed as primary sludge. The clarified effluent overflows from the surface and passes to the secondary treatment, while the primary sludge is sent to the sludge treatment units.

For a competitive examination candidate, primary treatment is a high-yield topic because it introduces the theory of sedimentation, the types of settling tanks, the design parameters and the formula for the settling velocity of particles. Numerical problems on the settling velocity, on the area of a settling tank and on the detention period are frequently set, and these are presented with fully worked solutions in this chapter.

2. The Theory of Sedimentation

Sedimentation is the process by which the suspended particles in a liquid settle to the bottom under the action of gravity. In a settling tank, the sewage is allowed to remain nearly still, and the particles that are heavier than water begin to fall. The velocity at which a particle falls in still water is called the terminal settling velocity or the fall velocity, and for small spherical particles it is given by Stokes' law:

Vs = (g x (S - 1) x d squared) / (18 x v)

where Vs is the settling velocity, g is the acceleration due to gravity, S is the specific gravity of the particle, d is the diameter of the particle and v is the kinematic viscosity of the liquid.

For a settling tank of rectangular plan, the area required depends on the surface loading, which is the rate of flow per unit surface area of the tank. The surface loading, also called the overflow rate or the surface overflow rate, has the same units as the settling velocity, and the particle that settles completely is the one whose settling velocity is equal to or greater than the surface loading. The volume of the tank is governed by the detention period, which is the average time the sewage spends in the tank, and is equal to the volume of the tank divided by the rate of flow.

The theory of the settling tank assumes that the flow is such that every particle entering the tank has the same detention period, so that a particle that falls through the full depth of the tank within the detention period is removed, while a smaller particle that falls a shorter distance is only partially removed. The efficiency of a settling tank therefore depends on the surface loading and not on the depth, because doubling the depth doubles the volume but leaves the surface area unchanged, and the removal of the settleable solids is governed by the surface area.

3. Types of Primary Settling Tanks

Primary settling tanks are built in two main shapes: rectangular tanks and circular tanks. A rectangular tank has a shallow basin with a width of about 3 to 6 metres, a length of 15 to 30 metres and a depth of about 2 to 3 metres, and the sewage enters from one end, flows along the length and overflows from the opposite end over a weir. The sludge that settles on the floor is scraped towards a sludge hopper at the inlet end by a travelling scraper mechanism, and the floating grease is removed by a skimmer fixed near the outlet.

A circular settling tank is a circular basin in which the sewage enters through a central inlet well and flows radially towards the peripheral outlet weir. The circular tank may be of the centre feed type, in which the sewage enters at the centre and the settled sludge is scraped towards the central hopper, or of the peripheral feed type, in which the sewage enters at the circumference and flows towards the centre. Circular tanks are preferred for large treatment plants because the scraping mechanism is simple and the surface is fully used for settling.

In the design of a settling tank, the important parameters are the surface loading, the detention period, the weir loading and the shape. The surface loading for primary tanks is 40,000 to 50,000 litres per square metre per day, the detention period is 1.5 to 2 hours, and the weir loading is about 150,000 litres per metre per day. The depth of the tank should be enough to allow the sludge to be scraped and the tank should have a floor slope towards the hopper so that the sludge flows easily to the outlet point.

4. Design of Primary Settling Tank

The design of a primary settling tank is a simple two-step calculation. First, the required surface area is computed by dividing the design flow by the surface loading, and then the volume and dimensions are fixed from the detention period and the depth. The tank is checked for the weir loading, which is the discharge per unit length of the outlet weir, and for the horizontal velocity, which must be low enough that the particles are not dragged along the bottom.

Problem: A primary settling tank is to treat a sewage flow of 12 million litres per day. If the surface loading is 45,000 litres per square metre per day, find the required surface area and the diameter of a circular tank.

Solution: Surface area = Flow / Surface loading = 12,000,000 / 45,000 = 266.67 square metres. For a circular tank, area = pi x D squared / 4, so D = sqrt(4 x 266.67 / 3.1416) = sqrt(339.5) = 18.43 m.

Answer: The required surface area is 266.67 square metres and the diameter is about 18.4 m.

Problem: A rectangular primary tank is 30 m long, 6 m wide and 2.5 m deep. If the flow is 9 million litres per day, find the surface loading, the detention period and the horizontal velocity.

Solution: Surface area = 30 x 6 = 180 square metres. Surface loading = 9,000,000 / 180 = 50,000 litres per square metre per day. Volume = 180 x 2.5 = 450 cubic metres. Flow = 9,000,000 litres per day = 9000 cubic metres per day. Detention period = Volume / Flow = 450/9000 = 0.05 days = 0.05 x 24 = 1.2 hours. Horizontal velocity = Flow / cross-sectional area = (9000/86,400)/(6 x 2.5) = 0.1042/15 = 0.00694 m/s.

Answer: The surface loading is 50,000 litres per square metre per day, the detention period is 1.2 hours and the horizontal velocity is 0.0069 m/s.

Problem: Find the settling velocity of a particle of diameter 0.1 mm and specific gravity 2.65 in water of kinematic viscosity 1 x 10^(-6) square metres per second, using Stokes' law with g = 9.81 m/s squared.

Solution: Vs = (g x (S - 1) x d squared)/(18 x v) = (9.81 x (2.65 - 1) x (0.0001)^2)/(18 x 10^(-6)) = (9.81 x 1.65 x 10^(-8))/(18 x 10^(-6)) = (1.6187 x 10^(-7))/(1.8 x 10^(-5)) = 0.00899 m/s.

Answer: The settling velocity of the particle is about 0.009 m/s.

4.1 Factors Affecting the Efficiency

The efficiency of a primary settling tank is controlled by several factors. The first is the surface loading, because a lower surface loading means that the sewage rises more slowly and smaller particles have time to settle. The second is the detention period, which must be long enough for the particles to reach the bottom; if the detention period is too short, the particles are washed out of the tank. The third factor is the depth of the tank, which affects the time available for settling, although the removal of discrete particles is governed mainly by the surface loading.

The fourth factor is the horizontal velocity of flow. If the horizontal velocity is too high, it drags the settled sludge along the floor of the tank and re-suspends the particles, so the horizontal velocity is kept below about 0.3 m/s and is usually much lower in practice. The fifth factor is the temperature of the sewage, because a higher temperature reduces the viscosity of the water and increases the settling velocity of the particles. Finally, the inlet and outlet arrangements must distribute the flow evenly across the width of the tank, because short-circuiting, in which some flow reaches the outlet quickly without being treated, reduces the efficiency of the tank.

Short-circuiting is the most common practical defect of settling tanks, and it is reduced by providing baffles, by using a properly designed inlet and outlet weir and by avoiding dead zones where the sewage becomes stagnant. The outlet weir must run across the full width of the tank so that the rising water is collected uniformly, and the weir loading should not exceed the design value, because a high weir loading means that the water near the weir rises quickly and drags the light particles with it.

5. Quick Revision Tables

Table 1: Design Parameters of a Primary Settling Tank

Parameter Recommended value
Surface loading 40,000 to 50,000 l/sq.m/day
Detention period 1.5 to 2 hours
Depth of tank 2 to 3 m
Weir loading 150,000 l/m/day
Horizontal velocity Less than 0.3 m/s
BOD removal 30 to 40 percent
Suspended solids removal 50 to 70 percent

Table 2: Rectangular and Circular Settling Tanks

Feature Rectangular tank Circular tank
Plan shape Rectangle Circle
Flow direction Longitudinal Radial
Inlet One end Centre or periphery
Scraping Travelling scraper Rotating mechanism
Suitability Small and medium plants Large plants

6. Mind Map

flowchart TD
    A[Primary Treatment] --> B[Theory of sedimentation]
    A --> C[Types of tanks]
    A --> D[Design parameters]
    A --> E[Factors affecting efficiency]
    B --> B1[Stokes law]
    B --> B2[Surface loading]
    B --> B3[Detention period]
    C --> C1[Rectangular tank]
    C --> C2[Circular tank]
    D --> D1[Surface loading 40-50k l/sqm/day]
    D --> D2[Detention 1.5 to 2 hours]
    D --> D3[Depth 2 to 3 m]
    E --> E1[Short-circuiting]
    E --> E2[Horizontal velocity]
    E --> E3[Temperature and viscosity]
    B1 --> F[Vs = g(S-1)d2/(18v)]

7. Important Diagrams (SVG)

The following diagrams show a circular primary settling tank and a rectangular settling tank with its flow pattern.

Circular Primary Settling Tank (Plan and Section) Central inlet well Outlet weir at periphery Sludge hopper at the centre bottom Sewage inlet Effluent overflow Primary sludge out Golden Rule Surface loading governs the removal of settleable solids, not the depth of the tank.

Rectangular Primary Settling Tank Inlet baffle Outlet weir Settling particles fall to bottom Sludge layer scraped to hopper Length 15 to 30 m, width 3 to 6 m, depth 2 to 3 m Golden Rule A detention period of 1.5 to 2 hours removes 30 to 40 percent BOD in the primary tank.

8. Common Mistakes

  1. Many students apply Stokes' law to coarse particles; Stokes' law is valid only for small spherical particles settling in laminar flow.
  2. A frequent error is to think that increasing the depth of a settling tank increases its efficiency; the removal of discrete particles depends on the surface loading, not the depth.
  3. Some candidates confuse the surface loading with the flow velocity; the surface loading is the flow per unit surface area and has the units of a velocity.
  4. Students often design the primary tank for a detention period of 5 hours; the correct detention period is 1.5 to 2 hours.
  5. A common mistake is to ignore the horizontal velocity, which must be low enough to prevent the re-suspension of the settled sludge.
  6. Many candidates forget that the primary tank removes only 30 to 40 percent of the BOD and believe it removes the dissolved organic matter.
  7. Some students treat the settled sludge from the primary tank as harmless; primary sludge is organic and must be treated by digestion.
  8. Another recurring error is to ignore short-circuiting, which reduces the effective detention period and the removal efficiency.

9. Exam Tips

  1. Memorise Stokes' law formula Vs = g(S-1)d squared/(18v) and be ready to substitute the given values directly.
  2. Remember that the surface loading of a primary tank is 40,000 to 50,000 litres per square metre per day and the detention period is 1.5 to 2 hours.
  3. Note the removals: 30 to 40 percent BOD and 50 to 70 percent suspended solids in the primary settling tank.
  4. In design problems, compute the area as Flow / Surface loading and the detention period as Volume / Flow, keeping the units consistent.
  5. Remember that the depth of a primary tank is 2 to 3 m and the weir loading is about 150,000 litres per metre per day.
  6. Understand that the efficiency depends mainly on the surface area of the tank, not on its depth.
  7. Note that circular tanks are of centre feed and peripheral feed types, and the centre feed type is common.
  8. Remember that short-circuiting is reduced by baffles and by a properly designed inlet and outlet arrangement.

10. Conclusion

Primary treatment is the workhorse of the sewage treatment plant, because it removes the bulk of the settleable solids at a very low cost before the expensive biological units are reached. In this chapter we have studied the theory of sedimentation, including Stokes' law for the settling velocity and the concept of the surface loading, and we have seen that the surface loading, not the depth, governs the removal of the settleable solids. We have examined the rectangular and circular settling tanks and the design parameters of surface loading, detention period, depth and weir loading, and we have solved numerical problems on the area, the diameter, the detention period and the settling velocity. The factors that affect the efficiency, particularly short-circuiting and the horizontal velocity, have also been discussed. A candidate who masters the formula of Stokes' law and the standard design values of the primary tank will solve both the factual and the numerical questions of this chapter with confidence, and will be fully prepared for the biological secondary treatment that follows.