🏗️ Civil Engineering

20.1 Introduction to Surveying

Start MCQ Practice →

20.1 Introduction to Surveying

Subject: Civil Engineering Chapter: Surveying Topic: 20.1 Introduction to Surveying

1. Introduction

Surveying is the art and science of determining the relative positions of points on, above or below the surface of the earth, and of representing them on a map or plan. It is one of the oldest branches of civil engineering, and its history goes back to the ancient Egyptians who used rope-stretchers to reset the boundaries of fields after the annual floods of the Nile. In modern civil engineering, surveying is the essential first step of every project, because no road, railway, bridge, dam, building or canal can be designed or constructed without first knowing the exact shape, size and position of the land on which it will stand. For a competitive examination candidate, surveying is a highly scoring subject because the basic principles, instruments and terms are easy to grasp and are asked again and again in one-mark questions.

Surveying deals with two main classes of work. Plane surveying treats the surface of the earth as a plane, ignoring the curvature of the earth, and is used for small areas up to about 250 square kilometres where the errors introduced by neglecting curvature are within acceptable limits. Geodetic surveying treats the earth as a spheroid or sphere, takes the curvature of the earth into account, and is used for large areas such as states, countries and continents where the highest precision is required. Plane surveying is the basis of most civil engineering projects, while geodetic surveying is used by government agencies, the Survey of India and for establishing national networks of control points.

The purpose of surveying is twofold: to prepare a plan or map that shows the features of the land in their correct relative positions, and to establish the positions and levels of points on the ground so that the designed works can be set out correctly on site. A plan is a representation of a small area drawn on a large scale, while a map is a representation of a large area drawn on a small scale. In this chapter we will study the objects of surveying, the classification of surveying, the two fundamental principles on which all surveying rests, the meaning of the terms scale, plan, map, bearing and field book, and the important distinction between the surveyor's unit of area and the common unit of area.

2. Objects and Classification of Surveying

The objects of surveying are to collect field data about the features of the land, to prepare plans and maps, to compute areas and volumes, to establish reference lines and levels for design, and to set out or mark on the ground the positions of proposed structures. Surveying is required for the planning and design of roads, railways, bridges, dams, reservoirs, water supply schemes, sewerage schemes, buildings, airports and harbours. Survey data are also essential for legal purposes such as the fixing of property boundaries, for the computation of land areas for revenue and compensation, and for environmental and town planning studies. Without reliable survey data, no engineering work can be correctly located, dimensioned or executed.

Surveying can be classified in several ways. On the basis of the instrument used, surveying is classified into chain surveying, compass surveying, plane table surveying, theodolite surveying, tacheometric surveying, and photographic and aerial surveying. On the basis of the method used, it is classified into triangulation, traversing and the use of well-conditioned triangles. On the basis of the object, surveying is classified as land surveying, marine or hydrographic surveying, astronomical surveying, and mining surveying. On the basis of the nature of the field, surveying is classified into land surveying and topographic surveying. On the basis of whether the curvature of the earth is considered, surveying is divided into plane surveying and geodetic surveying.

The instrument-based classification is the one most commonly used in examinations. Chain surveying is the simplest method in which only linear measurements are made with a chain or tape, and it is suitable for small, fairly level, open areas. Compass surveying is used when a network of triangles is required over a larger area, and directions are measured with a magnetic compass. Plane table surveying uses a drawing board and alidade to plot the features directly in the field. Theodolite surveying is used for precise measurement of horizontal and vertical angles. Tacheometric surveying measures distances indirectly by stadia readings, avoiding the chain entirely, and is useful in rough and hilly country.

3. Fundamental Principles of Surveying

All surveying, however advanced, rests on two fundamental principles. The first principle is to work from the whole to the part. According to this principle, a large area should first be covered by a framework of a few large triangles or a system of control points, and the smaller details should then be filled in within this framework. The reason is that errors in the main framework affect every part of the survey, whereas errors in the details remain local and do not spread to the whole area. If a surveyor starts by measuring the details directly, small errors accumulate and distort the entire map, but if the main control framework is fixed first with the greatest possible accuracy, the details can be located without affecting the general correctness of the plan.

The second fundamental principle is to locate a point by at least two independent measurements. A new point can be fixed from known points by measuring two distances, by measuring two angles, by measuring one distance and one angle, or by any combination that gives two independent observations. For example, in chain surveying the position of a point P is fixed with reference to a survey line AB by measuring the perpendicular distance from P to the line, called the offset, and by measuring the distance along the line from A to the foot of the perpendicular, called the chainage. Similarly, in triangulation, a point is fixed by measuring two angles from two known stations, and its position is obtained by the intersection of the two rays. This principle guarantees that every plotted point is correctly located with respect to the control framework.

In addition to the two principles, the surveyor must adopt suitable methods of work. Before actual field measurements begin, a reconnaissance survey is carried out to examine the terrain, choose the positions of stations and survey lines, and plan the sequence of work. The field work should be executed with the highest possible accuracy, because it is cheaper and easier to measure accurately once than to redo a faulty survey. Throughout the work, the surveyor must use the correct instruments, keep careful field notes, and check every measurement by an independent method, because a survey that cannot be verified is of no value.

4. Scales, Plans, Maps and Important Definitions

The scale of a plan or map is the fixed ratio that every distance on the plan bears to the corresponding distance on the ground. The scale is usually stated as a representative fraction (RF), which is the ratio of the distance on the plan to the actual distance on the ground, expressed as a pure number. For example, an RF of 1/1000 means that one unit on the plan represents 1000 units on the ground. The scale may be written in the form of a statement such as 1 cm = 10 m, in the form of a ratio such as 1:1000, or graphically as a scale bar drawn on the map. A plan is drawn on a large scale because it covers a small area, while a map is drawn on a small scale because it covers a large area.

A plan is the representation, on paper, of a relatively small area of the ground drawn on a large scale, and it shows the horizontal projection of the features with their true relative positions. A map is the representation of a relatively large area drawn on a small scale, on which the curvature of the earth has to be considered. An atlas map is the smallest scale map, a topographic map covers a large district, and a cadastral map shows property boundaries. In civil engineering, the field book is the notebook in which the surveyor records all linear and angular measurements in the field, and it is the permanent record from which the plan is plotted later in the office.

A number of standard definitions are frequently tested. A survey station is a point at the beginning or end of a survey line, and it may be a main station, a subsidiary station or a tie station. A survey line is the line joining two survey stations. The chainage of a point is its distance from the beginning of a survey line, measured along the line. The offset is the perpendicular distance of a point from the survey line, or an oblique distance where the point cannot be located perpendicularly. The true meridian is the plane passing through the true north and south poles, the magnetic meridian is the direction shown by a freely suspended magnetic needle, and the bearing of a line is the horizontal angle it makes with a reference meridian. The term datum is the reference surface to which all levels are referred, usually mean sea level.

The area of a plot is usually computed from the plan using the units of the surveyor, and a common examination trap is the relationship between the surveyor's chain and the common chain. The surveyor's chain of 33 feet, also called Gunter's chain, gives 10 square chains equal to one acre, so that the surveyor's unit of area is the acre of 10 square chains. The common chain of 66 feet gives a common acre of 10 square chains of 66 feet each, so that one common acre equals 10 times the area of one surveyor's acre; in other words, the surveyor's acre is one tenth of the common acre. For this reason, areas computed with Gunter's chain are smaller, and the conversion between the two units is a favourite one-mark question.

Worked example: The scale of a plan is 1 cm = 25 m. A rectangular field measures 8 cm by 5 cm on the plan. Find the actual area of the field in hectares.

Solution: One centimetre on the plan represents 25 m on the ground, so the actual length is 8 x 25 = 200 m and the actual breadth is 5 x 25 = 125 m. The actual area is 200 x 125 = 25,000 square metres. Since one hectare equals 10,000 square metres, the area in hectares is 25,000 / 10,000 = 2.5 hectares.

5. Quick Revision Tables

Table 1: Classification of Surveying

Basis of classification Types Remarks
Instrument used Chain, compass, plane table, theodolite, tacheometric, photographic Most common examination basis
Method used Triangulation, traversing, trilateration Control framework methods
Object Land, marine, astronomical, mining Purpose of the survey
Nature of field Land survey, topographic survey Terrain conditions
Curvature considered Plane, geodetic Size of the area

Table 2: Important Definitions and Scale Values

Term Definition / Value
Representative fraction Ratio of plan distance to ground distance
Plan Small area, large scale
Map Large area, small scale
Surveyor's chain (Gunter's) 33 feet, area unit = surveyor's acre
Common chain 66 feet, 10 square chains = 1 common acre
Surveyor's acre One tenth of the common acre
Offset Perpendicular distance from survey line to point
Chainage Distance of a point from start of survey line

6. Mind Map

flowchart TD
    A[Surveying] --> B[Plane surveying]
    A --> C[Geodetic surveying]
    A --> D[Classification by instrument]
    A --> E[Principles]
    A --> F[Scale and plan]
    D --> D1[Chain survey]
    D --> D2[Compass survey]
    D --> D3[Plane table survey]
    D --> D4[Theodolite survey]
    D --> D5[Tacheometric survey]
    E --> E1[Work from whole to part]
    E --> E2[Fix point by two measurements]
    F --> F1[Representative fraction]
    F --> F2[Large scale - plan]
    F --> F3[Small scale - map]
    E1 --> G[Main framework first]
    E2 --> H[Offset and chainage]

7. Important Diagrams (SVG)

The following diagrams show the classification of surveying and the fundamental principle of locating a point by two measurements.

Classification of Surveying SURVEYING Plane survey Geodetic survey Chain / compass Theodolite Small area, plane surface Large area, curvature Plane table survey Plane survey is used for areas up to about 250 square km. Geodetic survey accounts for the curvature of the earth. Golden Rule Use plane surveying for small areas and geodetic surveying for large areas; the choice depends on curvature.

Locating a Point by Two Measurements A B P (point to be located) chainage = 170 m offset = 60 m Two distances Chainage + offset P is fixed by chainage along AB and perpendicular offset. Golden Rule A point is correctly located only when at least two independent measurements are made.

8. Common Mistakes

  1. Many students confuse a plan with a map; a plan covers a small area on a large scale while a map covers a large area on a small scale.
  2. A frequent error is to apply plane surveying to very large areas; plane surveying should be used only for areas up to about 250 square kilometres.
  3. Some candidates think the surveyor's chain is 66 feet; the surveyor's or Gunter's chain is 33 feet, while the common chain is 66 feet.
  4. Students often forget that the surveyor's acre is one tenth of the common acre, which leads to wrong area conversions.
  5. A common mistake is to plot details first and the framework later; the correct order is to work from the whole to the part, establishing the main framework first.
  6. Many candidates fix a point by only one measurement; the second principle requires at least two independent measurements to locate any point.
  7. Students frequently mix up chainage and offset; chainage is measured along the survey line while the offset is perpendicular to it.
  8. Some candidates forget the reconnaissance survey and start measurements immediately; the terrain must first be examined and stations selected.

9. Exam Tips

  1. Memorise the classification of surveying on the basis of instrument, method and object, because it is asked repeatedly in one-mark questions.
  2. Remember the two fundamental principles exactly: work from the whole to the part, and locate a point by at least two independent measurements.
  3. Learn the conversion that the surveyor's acre equals one tenth of the common acre, and that 10 square chains of 33 feet chains equal one surveyor's acre.
  4. Practise scale problems by converting the representative fraction into actual dimensions and then computing the area.
  5. Know that one hectare equals 10,000 square metres and one acre equals 4,840 square yards or 43,560 square feet.
  6. Understand the difference between the true meridian and the magnetic meridian, because the bearing definitions are the basis of compass surveying.
  7. Remember that reconnaissance is the preliminary examination of the area before the actual field measurements are taken.

10. Conclusion

Surveying is the foundation on which every civil engineering project is built, and a clear grasp of its introduction is essential before studying chain, compass, plane table and theodolite surveying. In this chapter we have studied the objects of surveying, the classification of surveying into plane and geodetic types and into the various instrument-based methods, and the two fundamental principles of working from the whole to the part and of locating a point by two independent measurements. We have also examined the meaning of scale, plan, map, representative fraction, chainage, offset and bearing, and the important distinction between the surveyor's chain and the common chain with their effect on the computed area. These basic ideas recur in every later chapter of surveying, and questions on them are guaranteed marks in competitive examinations. By mastering the definitions, classifications and conversion factors presented here, a candidate builds the conceptual foundation needed to score well in the entire surveying section.