Subject: Civil Engineering Chapter: Surveying Topic: 20.2 Chain Surveying
Chain surveying is the simplest and oldest method of surveying in which only linear measurements are made on the field, without the measurement of any angle. The entire area is divided into a network of well-conditioned triangles, and the details are located by measuring perpendicular or oblique offsets from the survey lines. Chain surveying is the most economical method for small, fairly level and open areas, and it is ideal for preliminary surveys and for preparing the plans of small plots, agricultural lands and roads. For a competitive examination candidate, chain surveying is a favourite topic because its terms, instruments and procedures can be tested with short and direct questions, and numerical problems on offsets, error correction and area computation are regularly asked.
The principle of chain surveying is simple: to plot a triangle on paper it is enough to know the lengths of its three sides. Therefore the field is first divided into a number of well-conditioned triangles whose sides are the survey lines, and the sides of these triangles are measured accurately with a chain or tape. The details such as buildings, roads, fences, rivers and boundaries are then located with respect to the survey lines by measuring offsets, which are the perpendicular distances of the details from the survey line, together with their chainages. Because only linear measurements are involved, chain surveying cannot be used for large or undulating areas, and it is not suitable where the details are numerous and irregular.
The fundamental requirement of chain surveying is that the triangles formed must be well-conditioned. A well-conditioned triangle is one whose angles are neither very small nor very large, and it is generally accepted that no angle in the triangle should be smaller than 30 degrees or larger than 120 degrees. An equilateral triangle is the best conditioned of all, because the point of intersection of two rays is then most accurately located. Ill-conditioned triangles, with very small or very large angles, give poor intersections and large plotting errors, and they must be avoided while laying out the framework. In this chapter we will study the instruments used in chain surveying, the field operations, the methods of locating details with offsets, the corrections applied to measured lengths, and the computation of area from the chain survey.
The principal instruments of chain surveying are the chain, the tape, the arrows or marking pins, the ranging rods, the offset rod, the pegs and the cross staff. The chain is the standard measuring device and is made of galvanised mild steel wire, with links and tallies. The Gunter's or surveyor's chain is 33 feet long with 100 links, each link being 0.66 feet long; 10 square chains of this chain equal one acre, and hence it is also called the surveyor's chain. The engineer's chain is 100 feet long with 100 links of one foot each, and the metric chain is 20 metres or 30 metres long with 100 links of 20 cm or 30 cm each. Every chain has tallies of brass attached at every metre or at every link of ten, which helps in reading the chainage quickly.
The tape is a more precise instrument than the chain and is used for measuring the offsets and for all measurements requiring greater accuracy. Steel tapes are the most accurate and are available in lengths of 20, 30 and 50 metres, while linen and synthetic tapes are lighter but less accurate and stretch easily. Arrows, also called marking pins, are made of hardened steel wire about 400 mm long, pointed at one end and bent into a ring at the other, and they are used to mark the position of the end of each chain length during chaining. Ranging rods are made of seasoned timber or metal about 2 to 3 metres long with alternate red and white bands one decimetre wide, and they are used for ranging, which is the process of fixing intermediate points on a survey line.
The offset rod is a light rod about 3 metres long with a hook at the top, used to measure offsets, and it carries a cross piece for setting the rod vertical. Pegs are wooden stakes about 15 cm long driven into the ground to mark the survey stations permanently. The cross staff is used to set out right angles or perpendicular offsets; it is a wooden or brass frame with two pairs of vertical slits at right angles to each other, so that when one pair is aligned along the survey line the other pair gives the perpendicular direction. Other instruments used are the optical square, which sets out a right angle by double reflection, the plumb bob for transferring points from the chain to the ground, and the ranging rods. Together these simple instruments enable all the linear measurements of a chain survey to be taken accurately and quickly.
The field work of chain surveying consists of reconnaissance, survey, and marking of stations, followed by chaining and offsetting. The reconnaissance survey is the preliminary inspection of the area in which the surveyor walks over the ground, studies the general layout of the features, and decides the position of the main stations and survey lines so that the whole area is covered by well-conditioned triangles. After reconnaissance, the stations are selected at the corners of the triangles and are marked with pegs, and the survey lines are drawn on the field sketch. Subsidiary stations are fixed on the survey lines as required, and tie stations are located so that offsets to nearby details can be taken conveniently.
Ranging is the process of establishing intermediate points on a straight line between two end stations, and it is done by fixing ranging rods at the intermediate points so that they lie exactly in the same straight line as the end rods. Direct ranging is used when the two ends are intervisible, and the surveyor stands slightly to one side of the near rod and moves the intermediate rod until it is in line with the far rod. Reciprocal ranging is used when the two ends are not intervisible, such as when a hill intervenes, and the two surveyors adjust their rods alternately until both are in line. Obstacles to ranging include obstacles to chaining, such as ponds and rivers, which are crossed by special methods, and obstacles to ranging, such as hills and buildings, which are overcome by the methods of indirect ranging.
Chaining is the actual measurement of the survey lines with the chain. A chainman walks ahead with the forward end of the chain and places an arrow at the end of every chain length, while the leader keeps the chain straight and level; the number of arrows gives the number of full chains. Folding of the chain from full chain to full chain is continued along the whole line, and at the end the last partial chain is measured by reading the tallies. During chaining, care is taken that the chain is neither sagging nor dragging, the pull is steady, and the chain is horizontal. Offsets are then measured with a steel tape or offset rod from the survey line to the details, and both the chainage of the foot of the offset and the length of the offset are recorded in the field book.
An offset is the lateral distance of an object or detail from the survey line. A perpendicular offset is measured at right angles to the survey line and is used for near objects and straight boundaries, while an oblique offset is measured at an angle and is used when the perpendicular cannot be taken due to an obstacle or when the object is far from the line. The maximum length of a perpendicular offset is generally limited to about 15 metres, and if a point is farther away, its position is fixed by measuring two oblique offsets or by chaining on a separate subsidiary line. The offset is always taken at the chainage of the foot of the perpendicular, and both values are entered together in the field book, which is kept so that the entries correspond to the direction of chaining.
The measured length of a line may differ from the true length because of errors in the chain itself, such as a chain that is too long or too short, or because of errors in pulling, sagging and temperature. If a chain is too long, the measured distance is less than the true distance, and the measured area is less than the true area, and vice versa for a chain that is too short. The error in the chain is corrected by applying the formulae: true length = measured length multiplied by the ratio of the actual length of the chain to the nominal length of the chain, and true area = measured area multiplied by the square of that ratio. For example, if a 20 m chain is found to be 20.1 m long and a line is measured as 100 m, the true length is 100 x (20.1/20) = 100.5 m.
The area of the surveyed plot is computed from the network of triangles and from the offsets. The area of each triangle is computed by the formula half base times height, or by Heron's formula using the three measured sides. The area under each offset is computed by the trapezoidal rule or Simpson's rule, treating the offsets as ordinates of a curve at known chainages. The trapezoidal rule gives the area as the chainage interval multiplied by the sum of the first and last offsets plus twice the sum of the intermediate offsets, all divided by two, while Simpson's rule, which is more accurate and requires an even number of intervals, gives the area as one third of the common interval times the sum of the first and last ordinates, four times the sum of the even ordinates and two times the sum of the odd ordinates.
Worked example: A survey line AB is measured with a 30 m chain and is found to be 450 m long. Later it is found that the chain was 30 cm too short. Find the true length of the line.
Solution: The actual length of the chain is 30 - 0.30 = 29.7 m, and the nominal length is 30 m. The true length is equal to the measured length multiplied by the ratio of the actual length to the nominal length, that is, 450 x (29.7/30) = 450 x 0.99 = 445.5 m. Since the chain was too short, every measured chain length actually covered less ground, so the true length is less than the measured length.
| Type of chain | Length | Number of links | Length of link |
|---|---|---|---|
| Gunter's or surveyor's chain | 33 feet | 100 | 0.66 feet |
| Engineer's chain | 100 feet | 100 | 1 foot |
| Revenue chain | 66 feet | 100 | 0.66 feet |
| Metric chain | 20 m or 30 m | 100 | 20 cm or 30 cm |
| Condition | Effect on measured length | Effect on measured area |
|---|---|---|
| Chain too long | Measured length less than true | Measured area less than true |
| Chain too short | Measured length more than true | Measured area more than true |
| True length | Measured length x (actual chain / nominal chain) | - |
| True area | Measured area x (actual chain / nominal chain) squared | - |
flowchart TD
A[Chain Surveying] --> B[Only linear measurements]
A --> C[Instruments]
A --> D[Field work]
A --> E[Offsets]
A --> F[Corrections]
A --> G[Area computation]
C --> C1[Chain and tape]
C --> C2[Ranging rods]
C --> C3[Arrows and pegs]
C --> C4[Cross staff and optical square]
D --> D1[Reconnaissance]
D --> D2[Station marking]
D --> D3[Ranging]
D --> D4[Chaining]
E --> E1[Perpendicular offset]
E --> E2[Oblique offset]
F --> F1[Chain too long or short]
F --> F2[True length and area formulae]
G --> G1[Trapezoidal rule]
G --> G2[Simpson's rule]
The following diagrams show the layout of a chain survey triangle with offsets and the method of perpendicular offsets from a survey line.
Chain surveying is the simplest form of surveying and the natural starting point for the study of field instruments and procedures. In this chapter we have studied the instruments used in chain surveying, including the chain, tape, ranging rods, arrows, offset rod and cross staff, and the field operations of reconnaissance, ranging, chaining and offsetting. We have examined the concept of well-conditioned triangles, the methods of locating details by perpendicular and oblique offsets, and the corrections that must be applied when the chain is too long or too short. We have also studied the computation of areas using the trapezoidal rule and Simpson's rule, and we have solved a worked example on the correction of a line measured with a faulty chain. These skills are directly tested in competitive examinations and are also the practical basis of all larger surveys. By mastering the instruments, procedures and correction formulae of chain surveying, a candidate secures a firm foundation for compass surveying and the higher methods that follow.