🏗️ Civil Engineering

22.1 Highway Development and Classification

Start MCQ Practice →

22.1 Highway Development and Classification

Subject: Civil Engineering Chapter: Transportation Engineering Topic: 22.1 Highway Development and Classification

1. Introduction

Transportation is the backbone of a nation's economic and social development, and among all modes, road transport carries the largest share of both passenger and freight traffic in India because it offers door-to-door service, flexibility and economy over short and medium distances. Highway engineering is that branch of civil engineering which deals with the planning, design, construction, maintenance and operation of roads, and a sound understanding of how highways have developed in India and how they are classified is essential for every civil engineering aspirant. Questions on the Jayakar Committee, the Central Road Fund, the three twenty-year road development plans and the classification of roads appear regularly in competitive examinations, so this chapter forms a high-yield section of the transportation syllabus.

The growth of road transport in India was slow until the early twentieth century, when the condition of roads became a matter of national concern. The Government of India appointed the Jayakar Committee in 1927 to study road development, and the recommendations of this committee led to the constitution of the Central Road Fund in 1929 and the establishment of the Indian Roads Congress in 1934. These three landmarks, together with the road development plans of 1943, 1961 and 1981, provided the systematic framework under which the Indian road network has grown to become one of the largest in the world.

In this chapter we will study the historical development of highways in India, examine the targets and formulae of the three twenty-year road development plans, and learn the classification of roads adopted by the Indian Roads Congress. Special attention is given to the numerical formulae used for estimating the required road length, because one-mark and two-mark numerical questions based on these formulae are a favourite of the examiners.

2. Historical Development of Highways in India

The first systematic effort to develop roads on a scientific basis came with the appointment of the Jayakar Committee in 1927, which made several important recommendations. The committee recommended that a central fund be created to finance road development, that a semi-official technical body be formed to look after road research and development, and that road development be treated as a national concern rather than a provincial matter. As a result of these recommendations, the Central Road Fund was constituted in 1929 by levying a duty on petrol, the Indian Roads Congress was formed in 1934 as the apex technical body for highways, and the Central Road Research Institute was established at New Delhi in 1950 for road research.

The Central Road Fund (CRF) is financed mainly from a cess on petrol and diesel, and the fund is used for the development and maintenance of roads. The Motor Vehicles Act of 1939 regulated road traffic and was later replaced by the Motor Vehicles Act of 1988. The National Highways Act of 1956 declared certain roads as national highways and gave the central government the responsibility for their development. On the administrative side, the Ministry of Surface Transport at the centre and the Public Works Department in each state manage the road network, with the Border Roads Organisation looking after strategic roads in border areas.

The development of roads in India was formalised through a series of twenty-year road development plans. The first twenty-year plan, known as the Nagpur Road Plan, covered the period 1943 to 1963 and was prepared at the Nagpur Conference of 1943. The second twenty-year plan, the Bombay Road Plan, covered 1961 to 1981, and the third twenty-year plan, the Lucknow Road Plan, covered 1981 to 2001. Each plan fixed targets for the total road length and provided formulae for estimating the road length required in a district.

3. Highway Classification

Roads in India are classified by the Indian Roads Congress into five broad categories according to their function and the traffic they carry: National Highways (NH), State Highways (SH), Major District Roads (MDR), Other District Roads (ODR) and Village Roads (VR). National highways are the arterial roads of the country that connect state capitals, major ports, large industrial centres and border roads; they form the primary system and carry the highest volume of through traffic. State highways are the arterial roads of a state that connect district headquarters with national highways, and together with the national highways they form the primary system. Major district roads connect important towns within a district to the state highways and to each other, and they form the secondary system.

Other district roads connect production and marketing centres within a district, while village roads connect villages with the other roads of the district and to market centres; these two together form the tertiary system. The Nagpur Road Plan originally used the terms trunk roads, major district roads, other district roads and village roads, and it also fixed the required width of each category. For the purpose of the road plans, the length of the road network is expressed in kilometres, and each category has a design speed and geometric standard appropriate to its function.

Under the Lucknow Road Plan, the roads were regrouped into primary, secondary and tertiary systems. The primary system consists of the national highways, the secondary system consists of the state highways and major district roads, and the tertiary system consists of the other district roads and village roads. Expressways were also introduced in the third plan, and it was proposed to construct about 1600 km of expressways in the country. The classification determines not only the geometric design standards but also the authority responsible for construction and maintenance, since national highways are maintained by the central government, state highways and major district roads by the state governments, and the lower categories by the district authorities or local bodies.

4. Road Plan Formulae and Numerical Problems

The road development plans provide empirical formulae for estimating the length of roads required in a district or state. The Nagpur formula for a developed and agricultural area is L = 4A + 2B + C + D, where L is the total road length in miles, A is the developed and agricultural area in square miles, B is the undeveloped area in square miles, C is the length of railway lines in miles, and D is the number of towns and villages having a population between 2000 and 5000. Additional allowances are made for towns with larger populations, such as 0.0065 times the number of towns having a population of 5001 to 10,000, 0.003 times the number having 10,001 to 20,000, and 0.002 times the number having above 20,000.

The Bombay Road Plan gave the formula L = 38.4 + 2.5N + 1.0A + 0.07P, where L is the total road length in kilometres, N is the number of towns and villages with a population above 5000, A is the developed and agricultural area in square kilometres, and P is the total population. The Lucknow Road Plan gave separate formulae for each class of road. For national highways the length is L(NH) = 3275 + 6.1K, where K is the number of towns having a population between one lakh and five lakhs; for state highways the length is L(SH) = 12.8P + 64.3T + 20.2R + 7.4Q, where P, T, R and Q are the numbers of towns having populations above 5 lakhs, between 1 lakh and 5 lakhs, between 50,000 and 1 lakh, and between 20,000 and 50,000 respectively.

Solved Problem 1: Using the Nagpur formula, estimate the length of roads required for a developed district with an agricultural area of 120 square miles, an undeveloped area of 40 square miles, a railway length of 30 miles and 15 towns of population 2000 to 5000. Solution: L = 4A + 2B + C + D = 4(120) + 2(40) + 30 + 15 = 480 + 80 + 30 + 15 = 605 miles. The required road length is 605 miles.

Solved Problem 2: A district has 60 towns with a population between one lakh and five lakhs. Find the length of national highways required by the Lucknow formula. Solution: L(NH) = 3275 + 6.1K = 3275 + 6.1(60) = 3275 + 366 = 3641 km. The required national highway length is 3641 km.

5. Quick Revision Tables

Table 1: Road Development Plans at a Glance

Plan Period Headquarters Total road length target Road density
First (Nagpur) 1943-1963 Nagpur 5.32 lakh km 16 km / 100 sq km
Second (Bombay) 1961-1981 Bombay 10.57 lakh km 22 km / 100 sq km
Third (Lucknow) 1981-2001 Lucknow 14.31 lakh km 32 km / 100 sq km

Table 2: Classification of Indian Highways

Category System Function Typical authority
National Highways (NH) Primary Connect capitals, ports, borders Central government
State Highways (SH) Primary Connect district HQ with NH State government
Major District Roads (MDR) Secondary Connect towns within district State / district
Other District Roads (ODR) Tertiary Connect production and market centres District / local
Village Roads (VR) Tertiary Connect villages to road network Local bodies

6. Mind Map

flowchart TD
    A[Highway Development and Classification] --> B[History]
    A --> C[Classification]
    A --> D[Road development plans]
    B --> B1[Jayakar Committee 1927]
    B --> B2[Central Road Fund 1929]
    B --> B3[IRC 1934]
    B --> B4[CRRI 1950]
    C --> C1[National Highways]
    C --> C2[State Highways]
    C --> C3[Major District Roads]
    C --> C4[Other District Roads]
    C --> C5[Village Roads]
    D --> D1[Nagpur Plan 1943-63]
    D --> D2[Bombay Plan 1961-81]
    D --> D3[Lucknow Plan 1981-2001]
    D1 --> E[L = 4A + 2B + C + D]
    D2 --> F[L = 38.4 + 2.5N + 1.0A + 0.07P]
    D3 --> G[L NH = 3275 + 6.1K]
    C1 --> H[Primary system]
    C2 --> H

7. Important Diagrams (SVG)

The following diagrams show the hierarchy of road classification in India and the chronological development of the road network through the three twenty-year plans.

Hierarchy of Road Classification in India ROAD SYSTEM PRIMARY - NH, SH SECONDARY - MDR TERTIARY - ODR, VR National Highways Central government Major District Roads District authority Village Roads Local bodies NH connect capitals, ports and border roads. SH connect district HQ with NH. MDR, ODR and VR serve intra-district traffic. Golden Rule NH and SH form the primary system; MDR the secondary; ODR and VR the tertiary system.

Timeline of Highway Development in India 1927-1934 Jayakar + IRC 1943-1963 Nagpur Plan 1961-1981 Bombay Plan 1981-2001 Lucknow Plan Nagpur target 5.32 lakh km, density 16 km / 100 sq km Bombay target 10.57 lakh km, density 22 km / 100 sq km Lucknow target 14.31 lakh km, density 32 km / 100 sq km CRF constituted 1929; CRRI established 1950 National Highways Act 1956; Motor Vehicles Act 1988 Golden Rule Remember the three plans in order: Nagpur, Bombay and Lucknow with their targets and periods.

8. Common Mistakes

  1. Many students mix up the periods of the three road development plans; the Nagpur plan ran from 1943 to 1963, not from 1939.
  2. A frequent error is to assign the target of 14.31 lakh km to the Nagpur plan; this target belongs to the Lucknow plan of 1981-2001.
  3. Some candidates wrongly state that the Central Road Fund was constituted in 1934; it was constituted in 1929, while the IRC was formed in 1934.
  4. Students often use the wrong units in the Nagpur formula, taking area in square kilometres instead of square miles, which changes the answer completely.
  5. A common mistake is to confuse the primary and tertiary systems; NH and SH form the primary system while ODR and VR form the tertiary system.
  6. Many candidates forget the condition that D in the Nagpur formula is the number of towns with a population between 2000 and 5000, and include all towns.
  7. Some students write L(NH) = 6.1 + 3275K instead of 3275 + 6.1K, and then obtain absurd answers in numerical questions.
  8. Another recurring error is to state that expressways were introduced in the Bombay plan; they were actually proposed in the Lucknow plan.

9. Exam Tips

  1. Memorise the three plans as Nagpur 1943-63 (5.32 lakh km), Bombay 1961-81 (10.57 lakh km) and Lucknow 1981-2001 (14.31 lakh km).
  2. Remember the chronological landmarks: Jayakar Committee 1927, Central Road Fund 1929, IRC 1934 and CRRI 1950.
  3. Learn the Nagpur formula L = 4A + 2B + C + D and remember that it gives length in miles for a developed and agricultural area.
  4. For the Bombay plan, use L = 38.4 + 2.5N + 1.0A + 0.07P with N as towns above 5000 population.
  5. For the Lucknow plan, remember L(NH) = 3275 + 6.1K where K is the number of towns with population one to five lakhs.
  6. Note that road density under the Lucknow plan is 32 km per 100 sq km, a favourite one-mark question.
  7. Associate each class with its authority: NH with the central government and VR with the local bodies.
  8. In numerical questions, substitute directly into the formula and always state the unit of the final answer.

10. Conclusion

Highway development and classification form the foundation of transportation engineering because every road is planned, designed and maintained within this framework. In this chapter we have traced the historical development of highways in India from the Jayakar Committee of 1927 through the constitution of the Central Road Fund and the formation of the Indian Roads Congress, and we have studied the three twenty-year road development plans with their targets and formulae. We have also examined the five categories of roads into which the Indian network is classified and the way these categories are grouped into the primary, secondary and tertiary systems. The numerical formulae of the Nagpur, Bombay and Lucknow plans provide the quantitative tools for estimating the required length of the network, and the worked examples have shown how these formulae are applied. A candidate who remembers the periods, targets and formulae of the three plans, together with the classification of roads, can confidently answer the direct and numerical questions on this topic and build a solid base for the chapters on highway alignment and geometric design that follow.

(End of file - total 165 lines)