Traffic engineering is the branch of transportation engineering that deals with the planning, geometric design and traffic operations of roads and streets, and with their networks, terminals and the land they abut. It applies the scientific principles of planning, design and control to move people and goods safely, efficiently and economically. The scope of traffic engineering includes traffic characteristics, traffic studies and surveys, traffic regulation and control devices, traffic signals, parking, road safety and accident analysis, and the design of intersections. For a competitive examination, this topic is a very rich source of direct factual questions as well as numerical problems on signals and traffic flow.
Traffic on a road is not a simple stream but a complex mixture of vehicles with different sizes, speeds and acceleration capabilities, driven by human beings with widely different reactions and behaviour. The road user and the vehicle together form the traffic system, and an understanding of their characteristics is essential because all geometric design and control measures are ultimately based on the behaviour of the road user and the performance of the vehicle. The road user characteristics include the visual acuity, the reaction time, the perception time, the judgement of speed and distance, and the physical and emotional state of the driver, while the vehicle characteristics include the dimensions, the weight, the power, the braking efficiency and the speed capability.
In this chapter we will study the characteristics of the traffic stream, the various control devices used on roads, the design of traffic signals by Webster's method, and the conversion of mixed traffic into passenger car units. Numerical problems on signal cycle time and on passenger car units are extremely common, so these calculations are explained step by step with worked examples.
A traffic stream is described by three fundamental parameters: the flow or the volume, the speed, and the density. The flow is the number of vehicles passing a given point in a given time, expressed as vehicles per hour, and the flow at a point in unit time when measured at the instantaneous time is called the volume. The speed of a vehicle is the distance it travels in unit time, and the space mean speed and the time mean speed are the two averages used in traffic flow theory; the space mean speed is the harmonic mean of the spot speeds and is the fundamental average used in the flow relationship. The density is the number of vehicles occupying a unit length of the road, expressed as vehicles per kilometre.
These three parameters are related by the fundamental equation of traffic flow, q = k x v, where q is the flow in vehicles per hour, k is the density in vehicles per kilometre and v is the space mean speed in kilometres per hour. The relationship between speed and density is approximately linear; when the density is zero the speed is the free-flow speed, and when the density reaches the jam density the speed becomes zero. The maximum flow occurs at the critical density, and the capacity of a lane is the maximum hourly flow that the lane can carry under prevailing conditions. The design hourly volume and the peak hour factor are used to translate the design volume into the capacity requirements of a facility.
The road user and vehicle characteristics control the practical values of these parameters. The reaction time of a driver is taken as about 2.5 seconds for stopping sight distance calculations, the perception time being about 0.5 seconds and the brake reaction time about 2 seconds. Vehicle characteristics such as the braking efficiency and the coefficient of friction decide the braking distance, and the mix of vehicle types is expressed in passenger car units for capacity calculations.
Traffic control devices are the signs, markings and signals placed on or near the road to guide, warn and regulate the movement of traffic. The three broad classes of traffic signs are the regulatory signs, which inform the road users of traffic laws and regulations and which must be obeyed, the warning signs, which warn the road users of the hazards ahead, and the informatory signs, which provide information about routes, destinations and facilities. In India, regulatory signs have a circular shape with a white background and a red border, warning signs have a diamond or triangular shape with a yellow background, and informatory signs are rectangular with a blue background. Stop signs are octagonal with a red background, and give-way signs are an inverted triangle.
Road markings are the lines, words and symbols painted on the carriageway to regulate, warn and guide the traffic. Centre lines separate the two directions of traffic, lane lines separate the lanes in the same direction, and the stop line indicates where vehicles must stop at an intersection. A broken line permits crossing with care, a continuous line prohibits crossing, and a double continuous line completely prohibits crossing. The pavement edge lines mark the edge of the carriageway, and pedestrian crossings are marked by zebra crossings.
Traffic signals are the most positive form of traffic control and give the right of way alternately to the various movements at an intersection. The main types are the fixed-time signals, in which the cycle time and the green times are fixed in advance, the vehicle-actuated signals, in which the green times are extended according to the demand detected by the loop detectors, and the semi-actuated signals, in which the minor road is controlled by the detectors while the major road gets the green until a vehicle arrives. Signals are justified when the traffic volumes at an intersection reach the values recommended by the warrants, and they are installed only when they improve the safety and efficiency of the intersection.
The design of a fixed-time signal is commonly carried out by Webster's method, which gives the optimum cycle time. For each phase, the ratio y is the design flow divided by the saturation flow, and Y is the sum of the y values of all phases. The total lost time L is the sum of the starting delays and the clearance times lost in all phases. The optimum cycle time is C = (1.5L + 5) / (1 - Y). The total effective green time is (C - L), and the green time for each phase is allocated in proportion to its y value, that is g = y times (C - L) divided by Y.
The saturation flow is the maximum flow that can pass the stop line when the signal is green, commonly taken as about 1850 passenger car units per hour per lane for a straight-through movement. The design flow is taken as the highest of the peak-hour flows for the approach. The y value of a phase is therefore the ratio of the design flow to the saturation flow, and it must be less than unity.
Mixed traffic in India is converted into an equivalent single stream of passenger car units, using conversion factors from the Indian Roads Congress. A car is taken as 1.0 PCU, a scooter or motorcycle as 0.75 PCU, a three-wheeler or auto-rickshaw as 0.5 PCU, a bus and a truck as 3.0 PCU each, a bicycle as 0.2 PCU and a bullock cart as about 4.0 PCU. The total flow in PCU per hour is obtained by multiplying the number of vehicles of each class by its PCU factor and summing the results.
Solved Problem 1: A signalised intersection has two phases with critical flow ratios y1 = 0.30 and y2 = 0.20, and the total lost time is 4 seconds. Find the optimum cycle time and the green times. Solution: Y = 0.30 + 0.20 = 0.50. C = (1.5 x 4 + 5) / (1 - 0.50) = (6 + 5) / 0.50 = 22 s. Total effective green = C - L = 22 - 4 = 18 s. Green time for phase 1 = 0.30/0.50 x 18 = 10.8 s, and for phase 2 = 0.20/0.50 x 18 = 7.2 s.
Solved Problem 2: In one hour, a lane carries 500 cars, 100 buses, 200 scooters and 50 bicycles. Express the flow in PCU per hour. Solution: PCU = 500 x 1.0 + 100 x 3.0 + 200 x 0.75 + 50 x 0.2 = 500 + 300 + 150 + 10 = 960 PCU per hour.
| Vehicle type | PCU factor |
|---|---|
| Car / jeep | 1.0 |
| Bus / truck | 3.0 |
| Scooter / motorcycle | 0.75 |
| Three-wheeler (auto) | 0.5 |
| Bicycle | 0.2 |
| Bullock cart | 4.0 |
| Device | Shape / colour | Function |
|---|---|---|
| Regulatory sign | Circle, red border | Enforces laws, must be obeyed |
| Warning sign | Diamond / triangle, yellow | Warns of hazards |
| Informatory sign | Rectangle, blue | Gives route and facility information |
| Stop sign | Octagon, red | Complete stop required |
| Give-way sign | Inverted triangle | Give right of way |
| Centre line marking | Broken or solid line | Separates two directions |
flowchart TD
A[Traffic Engineering] --> B[Traffic stream parameters]
A --> C[Road user characteristics]
A --> D[Control devices]
A --> E[Traffic signals]
A --> F[PCU conversion]
B --> B1[Flow q]
B --> B2[Speed v]
B --> B3[Density k]
B1 --> G[q = k x v]
D --> D1[Signs]
D --> D2[Markings]
D --> D3[Signals]
E --> E1[Fixed time]
E --> E2[Vehicle actuated]
E --> E3[Semi actuated]
E1 --> H[Webster method C = (1.5L + 5)/(1 - Y)]
F --> F1[Car 1.0, Bus 3.0, Scooter 0.75]
D1 --> I[Regulatory, warning, informatory]
G --> J[Free flow speed and jam density limits]
The following diagrams show the fundamental relationships of the traffic stream and the cycle diagram of a two-phase traffic signal.
Traffic engineering applies the principles of planning, design and control to make the movement of people and goods safe and efficient, and it brings together the characteristics of the road user, the vehicle and the traffic stream. In this chapter we have studied the fundamental parameters of the traffic stream and their relationship q = k x v, the characteristics of drivers and vehicles that govern these parameters, and the various traffic control devices including the regulatory, warning and informatory signs, the road markings and the traffic signals. The design of fixed-time signals by Webster's method has been developed through the optimum cycle time formula and the allocation of green times, and the conversion of the mixed Indian traffic into passenger car units has been explained with worked examples. Numerical problems on signals and PCU conversion, which appear regularly in examinations, can now be solved with confidence. The studies that produce the data for these designs, namely the traffic studies and surveys, are examined in the next chapter.